Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 1000sets/year |
Place of Origin: | Zhejiang |
Location: | Taizhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Distributor/Wholesaler |
Main Products: | PET Preform Injection Mould/ Bottle Cap Mould/ PET High-speed Injection Machine |
Model No.: | YUS-96 |
---|---|
Means of Transport: | Ocean |
Product: | Others |
Product Material: | Plastic |
Shaping Mode: | Plastic Injection Mould |
Brand Name: | YUS |
Production Capacity: | 1000sets/year |
Packing: | Wooden case |
Delivery Date: | 45days |
96-cavity preform mold
Name | Description |
Mould material | 45#, P20, S136,3Cr13,2316 etc. |
Mould base | LKM, HASCO etc |
Cavity | Single/multi |
Runner | Hot/cold |
Design software | PROE, CAD, CAM,CAE etc. |
Plastic material | PP, PE, PET etc. |
Mould life | 500,000-3,000,000 shots |
Delivery time | 15-60days |
Specification | Depends on customer's requirements. |
Step
1.R&D | We support customer R&D. Make the files or improve the design if you needed. |
| |
2.Negotiation | the quality, price, material, delivery time, payment item, ect. |
| |
3.Place an order | according your own design or you chooses our design. |
| |
4. Mould | According customers request to build the 96-cavity preform mold . Before make the 96-cavity preform mold , we send 96-cavity preform mold design to customer approval first, before move forward to production; we send samples to customer to confirm first. |
| |
5. Sample shoot | If the first sample come out is not satisfied customer, we modify the mould and until meet customers satisfactory. |
| |
6.Products in store | If your quantity is beyond our storage, we will provide lead time to you. |
| |
7. Delivery | Delivery goods by sea or by air, according customers requirement. |
* The 96-cavity preform mold are employed Germany HOTSET Coil Heaters.
1.) All cores and cavities of 96-cavity preform mold are employed S136 stainless steel, and the main plate is employed P20.
2.) The delivery time is 30 days after receiving 40% down payment.
3.) The 96-cavity preform mold packaging is adopted wooden box.