user login

hdpe butt fusion injection end cap pipe fittings

0.49~300.0 USD
Min. Order: 10 Piece/Pieces
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 50000pcs/month
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer
Main Products: Pp Reducing Coupling Pipe Fittings Wth Pn16, Pp Female Threaded Coupling Compression Fittings, High Quality Pp Reducing Tee Pipe Fittings, High Quality Injection Pp Coupling Fittings, High Pressure Pp Equal Tee Pipe Fittings With Pn16

Product Detail

Model No.: aer1003
Means of Transport: Ocean, Air, Land
Head Code: Others
Shape: Equal
Technics: Others
Type: Cap
Material: Plastic
Connection: Others
Brand Name: aer
Material: HDPE80 or HDPE100
Working Pressure: SDR11,SDR13.6,SDR17
Surface Color: Black
Process: Injection
Means of transport: Ocean, air
Packing: Cartons or bags
MOQ: 10 cartons per size
Delivery Time: Within 45 days
Payment Terms: T/T, L/C at sight
Export Area: All over the world
Production Capacity: 50000pcs/month
Packing: cartons
Delivery Date: 45 days
Show

Product Description

hdpe butt fusion injection end cap pipe fittings

hdpe butt fusion injection end cap pipe fittings

***Advantages and welding of PE butt fusion flange adapter pipe fittings:

PE butt fusion stub end pipe fittings is light, which is more common for partial application 

pe80 pe100 grade level and two standards , including :

PE80 density of about 0.94 g / cm 3, PE100 density of about 0.96 g / cm 3 ;

Easy thermoplastic - easy to process ( such as injection molding, extrusion molding

Remanufacturing easy recycling

Good resistance to radiation and chemical stability

Good resistance to cold , the temperature can be -40 ℃ to

Excellent electrical insulation properties , is not affected by electrolytic corrosion

Malleable - extended break PE80> 700% PE100> 600%

Anti- erosion resistance - 8 times better than steel

Approximately half of the low thermal conductivity of glass

Smooth surface , unlike the role of metal pipes rust easily with oxygen crusts

pe pipe connection into fused pipe connections and fittings connected to melt , the more ordinary side,

the other , as well as socket connections, this method is applied to a small size.

1 , fused connection : Follow these steps: First check , and then is cut pipe , pipe fittings joints

clean , scrape the oxide layer , connecting the two parts of the tube and pipe fittings , calibration welder , welding parameter adjustment in accordance with the welding voltage, welding Dimensions , electricity, welding, and then finally cooled.

2, the hot melt connection : the inner surface of the pipe surface and the pipe is inserted while the welding is non-rotating die head is heated for a few seconds , then quickly removed and welding device , the heat pipe has a fast vertical insertion tube , packing, cooling to .

3 , socket connections, relatively simple, not elaborate here .

hdpe butt fusion injection stub end flange pipe fittings

Code No.: aer1003

Pressure Grade: SDR11,SDR13.6,SDR17

Packing: Plastic bag and cartons

Certificate: CE and ISO9001:2008

SIZE

SIZE

SIZE

SIZE

DN20

DN90

DN225

DN500

DN25

DN110

DN250

DN560

DN32

DN125

DN280

DN630

DN40

DN140

DN315

DN710

DN50

DN160

DN355

DN800

DN63

DN180

DN400

DN1000

DN75

DN200

DN450

DN1200


Post Buying Request