Min. Order: | 1000 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | D/P, T/T |
Supply Ability: | 10000pcs/month |
Place of Origin: | Zhejiang |
Location: | Ningbo, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Means of Transport: | Ocean, Air |
---|---|
Production Capacity: | 10000pcs/month |
Packing: | carton plus pallet |
Delivery Date: | 30 days |
Anodized aluminum end caps, made out of 6061-T6 or 6063-T5 (Lights & Lighting ยป LED Lighting Decoration)
They're made by casting process and then machined to drawings.
General lead time is 30 days for first samples, another few days for mass production run.
High low volume is acceptable. OEM service is offered.