Min. Order: | 1 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T, WU |
Supply Ability: | 99999pcs/month |
Place of Origin: | Tianjin |
Location: | Tianjin, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Agent, Distributor/Wholesaler, Service |
Main Products: | Carbon, Graphite Mold, Hi-tech Super Clay Graphite Crucible, Hi-Tech Graphite Gold Melting Crucibles, Hi-Tech Graphite Plate Block |
Model No.: | crucible 6 |
---|---|
Means of Transport: | Air |
Brand Name: | Hi-Tech Carbon |
origin: | china |
material: | graphite |
size: | as shown |
application: | gold,silver casting |
supply ability: | 5000pcs/month |
Production Capacity: | 99999pcs/month |
Packing: | carton box |
Delivery Date: | 20days |
Graphite Crucible
Bulk Density 1.85 g/cm3 Electric Resistivity 15unm Ash 0.1%
Bending strength 65 mpa Resist Compression 60mpa Particle 43um
Application :
Gold, Silver, Copper, Aluminum, Sterling Silver, Bullion,Tin, Zinc, Lead melting or
casting particular amorphous metals, rare metals and non-ferrous metals or alloys in MF Series and
Hardin Melting Furnaces ,Digital Electric Smelting Furnaces, hand held melting furnace...
Designed with grooved flange for crucible tongs and pour spout for easy pouring applications.
Size Sheet
The crucible is equipped with pouring spout and double flanges.
Capacity Gold/kg | Size mm | Net weight kg | ||||
Flange diameter | Inner diameter | Base diameter | Inner height | Out height | ||
1kg/30oz | 65 | 38 | 50 | 115 | 125 | 0.25 |
2kg/70oz | 72 | 44 | 55 | 140 | 155 | 0.34 |
3kg/100oz | 75 | 50 | 60 | 150 | 170 | 0.36 |
Notes
1. Graphite crucible should be kept away from humid environment, and must be stored in a dry place or on a wooden shelf.
2. Handle it with care. Falling or shaking is strictly forbidden.
3. Roast it in drying equipment or by a furnace before use, wait till its temperature gradually rises to 500°C.
4. Crucible should be placed below the mouth of furnace to prevent the furnace lid abrading the upper edge of the crucible.
5. Feed materials according to the smelting capacity of crucible. It is not allowed to feed too many materials, in order to avoid crucible swelling.
6. The furnace discharging tools and clamps should comply with the shape of the crucible,
and use the tools to clamp the middle section of the crucible to prevent local stress from damaging the crucible.
7. Knock the crucible gently while removing slags and sticky cokes on the internal and external wall of the crucible. Don't strike it heavily.
8. Keep appropriate distance between the crucible and the furnace wall. The crucible should be placed in the middle of the furnace.
9. Excessive use of combustion improver and additives will reduce the service life of crucible.
10. Rotate the crucible every week to extend its service life.
11. Prevent strong oxidation flame from reaching the side and bottom of the crucible directly.