Min. Order: | 1 Set/Sets |
---|---|
Payment Terms: | Paypal, L/C, T/T, WU |
Supply Ability: | 10 sets/month |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Means of Transport: | Ocean |
---|---|
Model: | COLO-S-668-1864-1517 |
Out dimensions: | standard |
Power supply: | Electric |
Voltage: | 380v/50hz |
Frequency: | 50~60hz |
Filters: | Polyester |
Filter count: | 2pcs |
Filters hang type: | Easy for change |
Filter cleaning system: | pneumatic |
Production Capacity: | 10 sets/month |
Packing: | wooden case |
Delivery Date: | 30days after payment |
including theCOLO manual powder coating equipment for lab test COLO-668T-06C, COLO-S-04548-T
electric spray booth,Lab test powder coating curing oven colo-4355-T
COLO manual powder coating equipment for lab test COLO-668T-06C has advanced coating features
such as C-Pulse, a coating option that is said to penetrate tough Faraday cage areas, reducing time and
material consumption.
• Enhance coating quality of flat and complex parts.
• Reduce operator fatigue
• Effective coating in corners and recesses
• Improved recoating ability
This powder spray booth design for powder coating testing or powder coating small object and DIY powder coating job With the filter which use for car,perfect perfermance ,With the hopper under ,easy for cleaning.
Working size dimension:D350*W450*H500mm
Overall dimension:D500*W500*H710mm
Power supply:electric/3w
Warm-up time:10-15min.(180 ℃)
Voltage/Frenquency:110V/220V(50-60HZ)
Temperature max:250℃
It is used for curing the workpiece which has been spraying during the powder coating.mostly used
for lab of powder coating or for small workpiece.
Technical Data
Inner Size | L450mm*W500mm*H350mm | |
Material: | t1.2mm galvanized plate | |
Thickness Insulation: | 150mm | |
Power supply: | ELECTRIC | |
Voltage: | ||
Frequency: | 50-60Hz | |
Door type: | ONE SIDE | |
Warm-up time: | 15 min. (180-220° C) | |
Homogeneity: | < ± 3°C if 185°C | |
Temperature stability: | < ± 1°C | |
Transport: | Top | |
Air circulation: | Forced | |
Total power of burner | 3KW | |
Warranty: | 12 Months |
Packing: wooden box as export standard
Delivery:uaually 10 days after get the deposit.
Effecient delivery can save your precious time.
Our Service
1,We are factory manufacture
2,We got ISO 9001 certificate and CE certificate
3,Our product have CE certificate
4,We are professional, rich export experience
5,We have stock for the goods
6,High quality with best price
7,Excellent after-sales service
Any question,pls contact sonne