Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | EXW |
Payment Terms: | Paypal, T/T, WU |
Supply Ability: | 30sets per year |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Means of Transport: | Ocean, Land |
---|---|
Brand Name: | COLO |
Inner Material: | t1.0mm galvanized plate |
Outter material: | t0.5mm galvanized plate |
Thickness Insulation: | 120mm |
Warm-up time: | 15 min. (180-220° C) |
Homogeneity: | < ± 3°C if 185°C |
Temperature stability: | < ± 1°C |
Temperature max: | 250° C |
Power supply: | 13.5KW |
Production Capacity: | 30sets per year |
Packing: | wooden box |
Delivery Date: | 30days |
Gas Powder Coating Curing Oven
1.Introduction
This Powder coating oven used for curing the workpiece which has been spraying
during the powder coating. When a thermoset powder is exposed to elevated
temperature, it begins to melt, flows out,and then chemically reacts to form a higher
molecular weight polymer in the surface of the workpiece.
2.Drawing (see attached file)
3.Structure
consist of Body,insulation, cover, heater. use gas to create the energy ,through the
circulating fan ,make the temperature in the oven to rise uniformly. Then make the
temperature of workpiece to rise.built-in track to roll your powder coating racks into
the ovens could be ordered together as you required.
4.Technical parameters
Inner Size | L3500mm*W2000mm*H1500mm | ||||
Outter Size: | L4700mm*W2250mm*H1750mm | ||||
Material: | t1.2mm galvanized plate | ||||
Thickness Insulation: | 120mm | ||||
Power supply: | GAS | ||||
Voltage: | 380V | ||||
Frequency: | 50-60Hz | ||||
Door type: | Double sided | ||||
Warm-up time: | 15 min. (180-220° C) | ||||
Homogeneity: | < ± 3°C if 185°C | ||||
Temperature stability: | < ± 1°C | ||||
Temperature max. | 230° C | ||||
Transport: | Top | ||||
Air circulation: | Forced | ||||
Band of burner: | Italian Riello | ||||
Model of burner | RIELLO 40 FS 20 | ||||
burner capacity: | 200,000 KCAL (81-220kw) | ||||
power of motor | 0.15KW | ||||
Total power of burner | 0.25KW | ||||
Warranty: | 12 Months |
5.Curing oven heating ( heating energy ) selection
Heating system classification
1. Gas hot air heating system ( full automatic ) ---- Which is preferred by box curing oven. Powder coating line continuous operation can also be selected ( Box furnace or powder coating line curing tunnel should choose gas system
2. Fuel hot air heating system ( full automatic ) ---- As oil prices rise, higher operating costs
3. Far-infrared radiation heating system ( full automatic ) --- Running costs are high, but the equipment investment is the most economical, especially small quantities spraying may be considered.
any quuestion,pls contact sonne