Min. Order: | 1 Set/Sets |
---|---|
Payment Terms: | T/T |
Supply Ability: | 1set per month |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Means of Transport: | Ocean |
---|---|
Extra Services: | Painting / Powder Coating |
Automation: | Automatic |
Certification: | CE |
Material / Metal Processed: | Aluminum |
Brand Name: | COLO |
Production Capacity: | 1set per month |
Packing: | nude packing |
Delivery Date: | 30days |
The whole Aluminum Profile production line includes water drying
oven, powder curing oven, heat-exchanging system, suspension conveyor
machine, electric control system, Powder coating chamber powder spraying equipment and so on.
Design principle
1. Take the advanced technical and quality requirement into consideration when adopt the techincs proposal of production line.
2. To assure the technique and technique parameter come true when we design and chose the model of equipment.
3. We assure all equipment advanced, practical, reliable and safe. The main equipment and component are outstanding brand.
4. To improve the automatization of production, the work environment and sanitation and carry out the power coating equipment industry criterion and safety precautions in China, we manufacture current and standard equipment by ourselves.
5.
We take the reasonable of production process flow, harmony, order,
beauty, convenient to operation and repair into consideration when
design the layout.
6. Try our best reduce the oneoff invest, power
consumption and the production cost when we meet the buyer's various
technical requirement.
powder coating line has conveyor speed adjustment and production capacity adjustment
1 | Product | Aluminum profile |
2 | Spraying type | Powder |
3 | Max work piece dimension | 7000×200×1600 L×W×Hmm |
4 | Speed of technique for the production line | Powder spraying V is 2.0m/min 0.5 to 3.5m/min adjustable |
5 | Heating type | nature Gas heating |
6 | Working of production line | Powder spraying is continuous. Pretreatment is intermittent tank soaking. |
7 | Transportation type of work piece | Suspension conveyor |
8 | Dimension of workshop | See the layout |
9 | Effective height of workshop | More than7m |
10 | Productivity | About 400 tons per month (20hours per day, 28days per month) |
Furnace is stable temperature and equalized heat distribution along the whole length of the hanger bracket with consideration of conveyor speed for production capacity and polymerization quality.