Min. Order: | 1 Set/Sets |
---|---|
Payment Terms: | T/T |
Supply Ability: | 6sets per year |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Means of Transport: | Ocean |
---|---|
Production Capacity: | 6sets per year |
Packing: | nude packing |
Delivery Date: | 65 days |
We have specialized engineers to design and manufacture automatic plants with various processes as per customers requirement.This plant consists of several processes which are made into one by our specialized design.
a single continuous powder coating process, whereby items are attached toan automated track, which subsequently travels through four separate powder coating process stages.This process delivers apre-treated and finished powder coated component at the end of the track.
Process One - Pre-treatment
Pre-treatment is a five stage process comprising of the following:
Stage 1: Is a highly Alkaline cleaner for steel alloys and zinc-coated steels
Stage 2: Cold rinsing from the main water supply.
Stage 3: Rinsing with De-mineralised water
Stage 4: silane-based multi-purpose liquid pre-paint treatment
Stage 5: Single ring rinsing with De-mineralised water
Process Two – Drying
A drying oven set at
approximately 180°C complements thepre-painttreatment and rinse water
process, to give an ideal substratefor powderapplication.
Process Three – Powder application
A combination of automatic and manual spray operations ensures that a controlled and consistent powder film build is achieved.
Aswork passes through the spray booth,
controlled amounts of powder are applied by automatic Electro-static
spray guns mounted on reciprocators.Difficult areas not reached by this
process are coated by an independent manual spray operation.
double door spray booth
ITEM | NAME | QTY | SIZE(L×W×H) | REMARK |
1), | Double door spray booth | 1set | 7000×1500×2900 | |
Operation size | 2pcs | 900×1600mm(W×H) | ||
Open size | 2pcs | 700×1800mm(W×H) | ||
Body material | δ=1.2mm cold plate, fold production | |||
Air velocity | 0.5-0.7m/s | |||
light | 2pc | 2-40W/set | ||
2) | Recovery | 1pc/set | ||
Type | Single Cyclone and Pulse blowback filters | |||
Process Wind flow | Single set | 18000m³/h | ||
Fliter number | 9pcs/set | Flither sizeφ325×1200mm | fast-loading | |
Pulse Solenoid valve | 9pcs/set | |||
Filter rotor body | 9pcs | |||
Recycling fan | 1pcs/set | Motor power:18.5KW | ||
3) | Manual Powder coating machine | 2pcs | COLO-500PGC1 | |
Automatic Powder coating machine | 2pcs | COLO-500PGC1 -A | ||
2m travel receprotator | 2pcs | COLO-2100D |
Process Four – Curing
After powder coating, the work pieces pass through a gas fired tunnel oven.
The deposited powder film flows then cures as the
metal temperature increases to that recommended for the powder applied.
During the courseof this process, the particles of powder bond together
to produce a continuous smooth finish.