Min. Order: | 100 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T, paypal, WU |
Supply Ability: | 100,000 pcs/Month |
Place of Origin: | Zhejiang |
Location: | Ningbo, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | EN 14604 Residential Home Security Smoke Alarm, EN54 System Heat Detector, Combined Stand-alone Smoke And Heat Detector, Domestic Anti-leak Water Alarm, 110v Ac Kitchen Flammable Gas Detector |
Model No.: | PW-517 |
---|---|
Usage: | Smoke |
Brand Name: | Peasway |
Color: | White |
Material: | ABS |
Size: | 102*35mm |
Certificates: | CE, ROHS, EN 14604 |
Alarm Decible: | 85 dB at 3M |
Production Capacity: | 100,000 pcs/Month |
Packing: | gift box / blister |
Delivery Date: | 25 days |
Product Features
1. Photoelectric sensing technology.
2. Standard quality to provide accuracy and stability
3. Uses a microprocessor for circuit control to assure
performance stability and reliability
4. Continuing self test function
5. Automatic sensor adjustment function ensures complete accuracy
6. Loud alarm signal exceeding 85 dB at 3m
7. Large test button, easy to verify operation
8. Hush button, to stop the alarm from sounding.
9. Low battery warning
10. Complying with EN14604 and VDS standard.
11. Easy installation and maintenance.
12. 5 year Guarantee
13. 10-year Long-life lithium battery.
Our factory
FAQ:
1. Are you a factory or trading company?
A: We are a factory. We are a professional factory producing smoke alarms, gas alarms, co alarms, water alarms, etc...
2. Where is your factory? How can I visit there?
A:Our factory is located in Ningbo City, Zhejiang Province, China, about 2 hours train from Shanghai. All our clients, from home or abroad, are warmly welcome to visit us!
3. Can you offer ODM/OEM?
A:Yes, we can offer ODM & OEM Service. Also, we can provide customized packaging and product design.
4. How can I get some samples?
A: We are honored to offer you free samples.
Samples can be ready in about 2 days.
5. How does your factory do regarding quality control?
A: Quality is priority. Peasway people always attach great importance to quality controlling from the very beginning to the very end.
6. What is the lead time?
A: Generally, the lead time would be 10-25 days according to different orders.