Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T, WU |
Supply Ability: | 30 sets/month |
Place of Origin: | Henan |
Location: | Zhengzhou, Henan, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Stone Crusher, Ball Mill, Magnetic Separator |
Model No.: | 6 M |
---|---|
Means of Transport: | Ocean |
Application: | Others |
Type: | Others |
Brand Name: | Kuangyan |
Inner size 1: | 4050*1240*650 mm |
Certificate: | ISO 9001:2000, CQC, BV. |
After-sales Service Provided: | Engineers available to service machinery overseas |
Size 2: | 4.2 M |
Inner size 2: | 4250*1240*650 mm |
Warranty: | 12 months start from the date of finishing installation. |
Model Number: | mould, mould base plate, steam curing cart. |
Size 3:: | 6 M |
Inner Size 3:: | 6050*1540*650 mm |
Installation:: | with our engineering's guidance. |
Production Capacity: | 30 sets/month |
Packing: | Standard export packing, container. |
Delivery Date: | 15-20 days after receipt deposit. |
Mould for AAC blocks sold to more than 30 countries
Materials slurry can be held in the combining of the mould and the bottom surface plate. After settling, curing and foaming it can be solidified into the blank. The bottom surface plate can bear the cake which shall be cut by the cutting machinery. and fed into the autoclave to be hardened together with the hardening car.
Main technical data:
Serial number | size | Inner size |
1 | 4M | 4050*1240*650 |
2 | 4.2M | 4250*1240*650 |
3 | 6M | 6050*1540*650 |
Process Flow
Step 1.Dosing and matching raw materials.
Step 2.Feeding matched raw material into pouring tank for mixing.
Step 3.Pour mixed materials into mould.
Step 4.Put mould into curing room for standstill hardening with temperature of 40ýý.This may take 2-3 hours.
Step 5-6.When block reachs a certain hardness(0.2-0.3Mpa) it would be hoistd and turned over by tilting hoistor which preparing for cutting.Then the block would be put on a cutting car and also demoulded.
Step 7-8.The cutting car transfer block through cutter for horizental cutting.
Step 9.After horizental cutting the cutting car would drive the block to below vertical cutting machine for vertical cutting.The whole cutting cycle may within 6 minutes.
Step 10.After cutting the block would be hoisted by a semi-finished hoister to the hardening car.
Step 11-12.The hardening car would transfer block into autoclave for hardening under a pressure of 1.3 Mpa with steam for 8-10 hours.
Step 13-15.The finished product leave out of autoclave and packing for delivery.
Step 16-17.After packing the side plate would return back to reorganize with demoulded mould.
Step 18.The mould would be clean-up and oil spraying for new cycle of pouring and cutting.
Step 19.Our plant can also make slab just pur steel bar into the slurry to reinforce the strength of slab.
AAC Block Plant working site:
Company Description
Henan Kuangyan Heavy Industry Machinery Co., Ltd. is a joint-stock enterprise which produces large-sized and medium-sized crushers and mills, mining equipments, and light AAC brick/block making machines.
Under such circumstances, we make full use of the good opportunity and try our best to have a great progress in technical transformation, innovation, improving the quality of products, and continuously expanding the domestic and overseas markets. Through years of development, our products have gained a favorable comment from markets all over the world. As the leading company in crushing & milling fields, we have developed series of newly-designed crushers by absorbing advanced scientific technology & processing experience from abroad and our experts' continuous research. It has been proved that our crushing products have covered a good market share both in domestic and overseas for high quality & easy maintenance.
Certificates
Workshop
Delivery
International Cooperation
It's our mission to provide superior service for you!
1. Pre-sale services:
Act as a good adviser and assistant of clients, enable them to get rich and generous returns on their investments.
1>. Select equipment model;
2>. Design and manufacture products according to clients' special requirement;
3>. Train technical personnel for clients.
2. Services during the sale:
Respect clients, devote ourselves to improving the total value of clients.
1>. Pre-check and accept products ahead of delivery;
2>. Help clients to draft solving plans.
3. After-sale services:
Provide considerate services to minimize clients' worries.
1>. Assist clients to prepare for the first construction scheme;
2>. Install and debug the equipment;
3>. Train the first-line operators;
4>. Examine the equipment;
5>. Take initiative to eliminate the troubles rapidly;
6>. Provide perfect service;
7>. Provide technical exchanges.