user login

China Earth Drilling, best quality drilling machine, pictures Pile Driver

50.0~100.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB
Payment Terms: T/T
Supply Ability: 1000set
Place of Origin: Hebei

Company Profile

Location: Langfang, Hebei, China (Mainland)
Business Type: Manufacturer
Main Products: Fiberglass Duct Rodder, Cable Roller, Cable Drum Jack, Cable Pulley, Wire Grip

Product Detail

Model No.: Earth Drilling
Means of Transport: Ocean
Production Capacity: 1000set
Packing: carton
Delivery Date: 5to7daya
Show

Product Description

Earth Drilling/Earth Excavator/pile driverPile Driver,Earth Drilling, Pile Driver

We produce pole drilling machine/hole Digger/earth drilling, which is widely used for cement pole and solar panel support in digging hole, drilling hole, driving pile .Our hole Digger/Earth Drilling/drilling machine is the first hydraulic hole Digger/Earth Drilling/drilling machine, its speed is five or six than other hole Digger/Earth Drilling/drilling machine. This hydraulic hole Digger/Earth Drilling/drilling machine is based on independent research , first adopt tractor as power, topping drill pipe design, achieve driving and operation integration.

It has good cross-country performance. Tractor can carry trailer lever to achieve digging integration.

pole drilling machine price /hole Digger/earth drilling manufacturer

Pole drilling feature:

1, use type 50-65 tractor as main power. Its good cross-country performance ,can well adapt digging work in outside. Fully hydraulic form , drilling down at the same time by two large tonnage oil cylinder promote drill bore into the downward, largely improve the work efficiency. pole drilling machine price /hole Digger/earth drilling, Topping drill pipe design, Only one person can finish work.

 

Technical data

Power equipment:50-65 tape four-wheel tractor

Drilling depth : 1-3.8 m

Drilling diameter:150-1000mm

Drill drive form: hydraulic

Ascending form: hydraulic

Time: 47 second(Dia. 500mm * depth 3 m)

Total weight:3.8 T

Geological layers: applied in  Soil lager ,clay layer, earth with gravel , weathered rock layer, intergeliosol ,etc, not in rock, construction rubbish layer, sand layer, life rubbish.

Operation staff: 1 person

Construction: 1, for digging cement pole hole in power construction, 2,for digging solar panel support hole in solar electrical energy construction. 3,for piling in construction.


Post Buying Request