Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T |
Supply Ability: | 1000set |
Place of Origin: | Hebei |
Location: | Langfang, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Fiberglass Duct Rodder, Cable Roller, Cable Drum Jack, Cable Pulley, Wire Grip |
Model No.: | Earth Drilling |
---|---|
Means of Transport: | Ocean |
Production Capacity: | 1000set |
Packing: | carton |
Delivery Date: | 5to7daya |
Earth Drilling/Earth Excavator/pile driverPile Driver,Earth Drilling, Pile Driver
We produce pole drilling machine/hole Digger/earth drilling, which is widely used for cement pole and solar panel support in digging hole, drilling hole, driving pile .Our hole Digger/Earth Drilling/drilling machine is the first hydraulic hole Digger/Earth Drilling/drilling machine, its speed is five or six than other hole Digger/Earth Drilling/drilling machine. This hydraulic hole Digger/Earth Drilling/drilling machine is based on independent research , first adopt tractor as power, topping drill pipe design, achieve driving and operation integration.
It has good cross-country performance. Tractor can carry trailer lever to achieve digging integration.
pole drilling machine price /hole Digger/earth drilling manufacturer
Pole drilling feature:
1, use type 50-65 tractor as main power. Its good cross-country performance ,can well adapt digging work in outside. Fully hydraulic form , drilling down at the same time by two large tonnage oil cylinder promote drill bore into the downward, largely improve the work efficiency. pole drilling machine price /hole Digger/earth drilling, Topping drill pipe design, Only one person can finish work.
Technical data
Power equipment:50-65 tape four-wheel tractor
Drilling depth : 1-3.8 m
Drilling diameter:150-1000mm
Drill drive form: hydraulic
Ascending form: hydraulic
Time: 47 second(Dia. 500mm * depth 3 m)
Total weight:3.8 T
Geological layers: applied in Soil lager ,clay layer, earth with gravel , weathered rock layer, intergeliosol ,etc, not in rock, construction rubbish layer, sand layer, life rubbish.
Operation staff: 1 person
Construction: 1, for digging cement pole hole in power construction, 2,for digging solar panel support hole in solar electrical energy construction. 3,for piling in construction.