Min. Order: | 200 Square Meter |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T |
Supply Ability: | 50000 sqm per month |
Place of Origin: | Shandong |
Location: | Linyi, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Model No.: | round |
---|---|
Means of Transport: | wagon, Ocean, Air, Land |
diameter: | 800mm |
length: | 2500-3000mm |
enhance: | steel belts every 30cm |
material: | filmfaced plywood |
plywood: | round shape, 2 pcs ,filmfaced |
thickness: | 18mm |
repeat: | 8 times |
special shape: | available |
origin: | linyi,china |
delivery time: | in stock |
Production Capacity: | 50000 sqm per month |
Packing: | pack in roll |
Delivery Date: | in stock |
factory directly sale column formwork systems
Factory directly sale column formwork systems
1. Made of plywood, light weight, easy handling
2. Grooves prevent the leakage of concrete
3. Easy cutting
4. Efficient installation and dismantling
5.Nice concrete finish without re-work
Application OF column formwork systems
For concrete forming of circular columns ,diameter 800mm
Installation 1.Treat inner ply film with concrete release agent firstly. 2.Fix the steel belts horizontally according to the lines. 3.If the height is more than 3000mm , please install it as the indication below. 4.Fromfeedback on site, only 2 skilled workers can install 15 circular columns in 8 hours.
Dismantling Simply untie the steel belts and the ply will separate easily.
Maintenance & Storage Lightly treat the ply film with oil before next usage. place the formwork vertical, away from direct sunlight and water.
Product Options
Specification
Comparison
Packing
one bundle by 6 pieces, inside craft paper and waterproof shrinking film, outside bag.
Technical data
|