user login

Q195 - Q345 3 Layer Polyethylene Anti corrosion Steel Pipe For Oil / Gas / Air , O.D 10mm - 1422mm

Place of Origin: Tianjin

Company Profile

Location: Tianjin, China (Mainland)
Business Type: Manufacturer
Main Products: Welded Steel Pipe

Product Detail

Model No.: Anti - Corrosion 63

Product Description

 

 

Q195 - Q345 3 Layer Polyethylene Anti corrosion Steel Pipe For Oil / Gas / Air , O.D 10mm - 1422mm

 

Quick Detail:

 

Outer Diameter/O.D/mm

10-1422

Wall Thickness/W.T/mm

1-80

Section Shape

Round

Standard

GB/T 9711.1-1997, GB/T 3091-2001, ASTM A106-2006, API 5CT, API 5L, 

API 5DP,DIN30670-1991,CJ/T120-2008,GB/T17219-1998,GB/T5130-2010,SY/T0315-97,SY/T0315-2005,SY/T0413-2002,CECS125:2001

Grade

Q195-Q345/S235/S275/S355/16Mn/10#-45#,/20MN2/SS41/A36/A35/ST37/ST35/A53-A369/16Mn/10#/20#/A53(A,B),A106(B,C),A269,A312,Q235, Q345, Q195, Q215

 

Special Pipe

API Pipe

Secondary Or Not

Non-secondary

 

Specifications:

 

We are the manufacturer of steel pipe/tube and steel coils. Supply high quality various sizes products,

the cheapest price and the best service for you. The list size we often produce for your reference.

We also always have the huge ready stock for sell.

 

Post Buying Request

Product

Q195 - Q345 3 Layer Polyethylene Anti corrosion Steel Pipe For Oil / Gas / Air , O.D 10mm - 1422mm

O.D/mm

10-1422

W.T/mm

1.0-80

Length/m

1-12 or According Customers’ Requirements

End Treatment

Plain/Beveled/varnished/Plastic caps at ends

Material

Q195-Q345/S235/S275/S355/16Mn/10#-45#,/20MN2/SS41/A36/A35/ST37/

ST35/A53-A369/16Mn/10#/20#/A53(A,B),A106(B,C),A269,A312,Q235, Q345,

 Q195, Q215

Base Pipe

SSAW / SAW / ERW / Seamless Steel Pipe / Tube / Tubing

Color

Black Or as customer’s requirements

Surface Treatment

3 layer PE exterior /3PE / 2PE / FBE / PE / anti-corrosion or as customers’ requires

Inspection

The third party inspection

Package

1.Big O.D:in bulk

2.Small O.D:packed by steel strips

3.woven cloth with 7 slats

4.Bevel end or plain end or varnished as per buyer's requirements. 

5.Marking: as per customer's requests.

6. Painting varnish coating on the pipe. 

7. Plastic caps at ends

Lead Time