Min. Order: | 50 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T, WU |
Supply Ability: | 400 sets per day |
Place of Origin: | Hebei |
Location: | Hengshui, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Model No.: | HT002 |
---|---|
Means of Transport: | Ocean, Air, Land |
Brand Name: | HT |
Frame pipe: | 20-48mm |
Material: | steel or stainless steel pipe |
Infill pipe: | 12-25mm |
Size: | 1mx1.49m,1.1x2.2m,1.2x2.4m,etc |
Pipe thickness: | 0.7-2.5mm |
Link by: | hook and self link |
Feet: | detechable or fixed feet |
Place of origin: | Anping,China |
Load: | by truck |
Type: | true factory |
Production Capacity: | 400 sets per day |
Packing: | by steel pallet,accessories with carton |
Delivery Date: | within 10 days |
long life and durable running event control barrier
galvanized or powder coated running event control barrier
Our running event control barrier is fully hot dipped galvanized in Gal bath.It is the best way to be galvanized.And powder coated after galvanized if needed.
Surface finish:hot dipped galvanized,powder coated,galvanized+powder coated
So the barrier will be much whether resistant,rust resistant,durable and use for lont life.
The event control barrier is light,which makes it early to handle,transpot.
Frame pipe:38mm x 1.6mm,32x1.2mm
Infill pipe:16x1.0mm,16x0.7mm
Spacing:100mm,160mm
with fixed or detecable feet