Min. Order: | 300 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 1000000000000pcs |
Place of Origin: | Guangdong |
Location: | Foshan, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | All Pipe Fitting, PE-AL-PE Composite Pipe, PVC Electric Pipe, PPR Pipe, PVC Drain Pipe |
Model No.: | 20-32 |
---|---|
Means of Transport: | Ocean, Land |
Head Code: | Others |
Shape: | Equal |
Technics: | Others |
Type: | Others |
Material: | Plastic |
Connection: | Welding |
Brand Name: | SWIN |
color: | white,gray,green |
size: | 20,25,32mm |
certificated: | ISO,CE,GB |
Production Capacity: | 1000000000000pcs |
Packing: | fitting are packed in a box |
Delivery Date: | in 10days when we got the deposite |
ppr pipe fitting/ ppr bypass bend/galvanized pipe bends
(1)Size(OD):20,25,32mm
(2)Colour:white,green,gray
(3)Pressure:PN25
Swin colored hot sale ppr pipe fitting/ ppr bypass bend/galvanized pipe bends
1.pipe fitting ppr pipe fitting ppr bypass bend Specification |
PPR hot/cold water price |
2.pipe fitting ppr pipe fitting ppr bypass bend Advantage |
Manufacturing:Founded in 2006,experienced The oscillation of the global financial crisis,With the most professional product research and development, training, after-sales troubleshooting guide service team, etc. High temperature resistance: the maximum sustained working temperature is up to 70 degrees, the maximum transient temperature is up to 95 degrees Heat preservation: low thermal conductivity result in preserving heat Non-toxic: no heavy metal additives, would not be covered with dirt or contaminated by bacterium Lower installation costs: light weight and ease of installation can reduce installation costs Higher flow capacity: smooth interior walls result in low pressure loss and high volume |
3.pipe fitting ppr pipe fitting ppr bypass bend Material |
material: 99.9% Korea RP2400 and brass inserts. |
4.Payment Terms |
1,Shipping term.By DHL,UPS,EXPRESS,FEDX,by air or by sea 2,Payment terms.Western Union or T/T.By T/T with 30% deposit before production, 70% balance before delivery,L/C,D/A,D/P. |
5.Packing Information |
Seaworthy export packing.1.carton,bags with inner small PE bags 2.plastic fim 3.by customers' requirem |