Product Description
The successful of JingZhingJing build on concern, support, and guide, supervision of domestic and international friends. The objectives of JingZhongJing are mutual-benefit and co-operation. JingZhongJing warmly look forward to the gracing the occasion with your presence.
1.Outside Size:(mm) 7040x5690x3420 (LXWXH)
2.Inside Size:(mm) 6900x4000x2650 LXWXH)
3.Front Door:(mm) 3000(W)x2600(H)
4.Total Power:(kw): 22
5.Cabin System
1),EPS (epispastics polystyrene)Colorful Steel Skin Boards, 70mm Thick, Tongue & Groove Style Compound Construction,
2) Aluminum-alloy Frame, Anti-flame and Heat-Insulation
3)Full Grid, Adjustable Height 300mm basement,
4)Galvanized Steel Sheet Construction, Three Embossed Steel Ramps.
6.Air Circulation System
1)Inlet Turbine Fan
Capacity: 23450m 3 /h
Power: 9kw
Quantity:1set
2)Outlet Turbine Fan
Capacity:30000m 3 /h
Power:7.5kw
Quantity: 1set
7. 36 pcs Ceiling Nozzles with 2 Centrifugal Fans for Drying Water Paint
Air Volume: 37000m 3 /h; Air Speed: 0.45m /s,400tims/h,
8.Air Purification system
Dual Filtering Structure, The Primary Filter Can Capture Granules Larger than 10 μm. Ceiling Filter Capture Granules Bigger than 5μm. The Whole Purification System Has Capacity of Large Volume of Dust. Its Filtering Rate Reaches 98%. Air Pressure Balance Gauge, TSP ≤ 1.2mg/m 3
9.Heating System
1).Burner
Italy Riello Brand,G20 Diesel Burner, 180000Kcal/h, 20N Damp Motor
2),Heat Energy Converters
Stainless Steel, Argon Arc Welding, The Heat Exchange Rate 85%
Max Temp:80 ºC Heating Time: 4-5min(20-60 ºC), Fuel Consumption: 4 -6kg /vehicle
10.Lighting System
Ceiling Light: 32 pcs 36w Philips Lamp; Bottom Light: 32 pcs 20w Philips Lamp, 1100 Lux
11.Electric Controlling System
PLC Controlling, Soft Touching Botton, Spray & Baking Switch, Light Switch, Emergency Stop, Breakdown Alarm
12.Environmental Conversation System
Multi-Layer Fiberglasss Filter
13.Additional
1)Enclosed tank tool cabinet, could put the paint and tools
2)Track guide made of high quality steel,convenient for spraying small workpiece
3)Configure one pc of trachea box box on the back wall of
booth, a built-in air compressor pressure gauge, pressure regulating valve, trachea joints