user login

Volumetric Gable-Top Carton Packing Equipment

Min. Order: 1 Set/Sets
Trade Term: FOB
Payment Terms: L/C, T/T, WU
Supply Ability: 50 sets per year
Place of Origin: Liaoning

Company Profile

Location: Shenyang, Liaoning, China (Mainland)
Business Type: Manufacturer
Main Products: Liquid Packaging Device, Beverage Filling Machines, Brick Carton Packaging Machines, Gable Top Carton Filling Machines, Automatic Liquid Packing Machine

Product Detail

Model No.: BW-1000
Means of Transport: Ocean, Air, Land
Processing: Filling Machine
Automatic Grade: Semiautomatic
Type: General
Usage: Inner
Packaging: Others
Brand Name: BEIYA
CERTIFICATE: CE Approved
Production Capacity: 50 sets per year
Packing: In plywood case.
Delivery Date: 30 working days
Show

Product Description

1. Work flow:

1) Carton Forming Machine: Put the carton onto the mandrel (manually) -- Bottom performing -- Bottom heating -- Bottom sealing

2) Capping Machine: Put the cap into and the carton's capping hole (manually) -- Ultrasonic welding

3) Filling Machine: Put the carton onto the conveyor (manually) -- Top preforming -- Filling -- Top heating -- Top sealing -- Date printing -- Finished product

2. Suitable for filling:

Milk, yogurt, cream, beaten egg, soy milk, juice, tea drink, corn drink, pure water, sauce, wine, cleaning solution, chemical product, sugar, grain, cornmeal, other dry powder, etc.

3. Technical parameter:

1. Capacity: 250--1000ml (can be filled by one machine)
2. Output: 800-1200 cartons/hour
3. Packing material: Cardboard carton / aluminium foil carton
4. Filling Temperature: Cold filling: 2-50 degC/ hot filling 88-92 degC
5. Cap: With cap (Optional)
6. Overall power: 23KW (three phases of electricity)
7. Size: (L*W*H): Carton forming machine: 1.3m*0.9m*1.5m
Capping machine: 0.8m*0.6m*1.2m
Filling machine: 2.0m*0.9m*2.6m
8. Compressed air pressure: 1.0-1.4 Mpa, Flow rate: 0.8-1.0M3/min, without oil, water and dust
9. Cooling water: Flow volume: ≥ 20L/ min Temperature: Normal temperature
10. Net Weight: 1200kg (carton forming machine: 300kg, capping machine: 100kg, filling machine: 800kg)
11. Installation requirement: Any smooth floor, such as cement, floor tile, plastic ground, etc. Do not need to make angle.

 

4. Payment terms

 1)T/T : 30% as deposit , 70% balance before shipment

 2) L/C at sight

 

5. Delivery time

  1) For automatic filling machine 60 days

  2) For semi-automatic filling machine 45 days

  3) For manual filling machine 30 days

 

6. After Sale Services

Shenyang Beiya Beverage Machinery Co.,Ltd will supply 12 months guarantee for all the equipments, and if customer need, we will send our technicians to customers' factory, install the machines and train customer's staff to operate the machine. we will supply all the spare parts with cost price if customer need.

arts with cost price if customer need.



Post Buying Request