Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T, WU |
Supply Ability: | 30 sets /month |
Place of Origin: | Zhejiang |
Location: | Taizhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | Mould, Injection Mould |
Model No.: | KJ010 |
---|---|
Means of Transport: | Ocean, Air |
Product: | Household Product |
Product Material: | Steel |
Shaping Mode: | Plastic Injection Mould |
Brand Name: | KJ MOULD |
Item: | plastic injection fork mould |
Cavity: | single |
Runner: | Cold / hot |
Mould Steel: | P20, 718,2316,2738,S136,H13,etc. |
Mould Base: | LKM,HASCO,etc. |
Design Software: | UG,PROE,CAD,etc. |
Processing Tolerance: | 0.003-0.005 |
Equipment: | CNC,EDM,etc. |
Delivery Time: | 30-60 days |
MOQ: | 1 set |
Production Capacity: | 30 sets /month |
Packing: | In wooden case |
Delivery Date: | 30-60 days |
name | plastic injection fork mould |
mould material | 45# 50# 718 2738 P20 S136 etc |
mould design | 3D/2D |
design days | 3-5 days |
mould life | 300.000-3.000.000 |
plastic material | PE PC PS PP ABS PVC etc. |
injection system | pin-point gate |
payment | 40% of deposit by L/C T/T 60% of balance by L/C T/T |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |