Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T, WU |
Supply Ability: | 30 sets /month |
Place of Origin: | Zhejiang |
Location: | Taizhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | Mould, Injection Mould |
Model No.: | KJ002 |
---|---|
Means of Transport: | Ocean, Air |
Product: | Household Product |
Product Material: | Steel |
Shaping Mode: | Plastic Injection Mould |
Brand Name: | KJ MOULD |
Item: | plastic pet preform mould |
Cavity: | 32 |
Runner: | valve gate hot runner |
Mould Steel: | 38CrMoAl,2316,2738,S136,H13,etc. |
Mould Base: | LKM,HASCO,etc. |
Design Software: | UG,PROE,CAD,etc. |
Processing Tolerance: | 0.003-0.005 |
Equipment: | CNC,EDM,etc. |
Delivery Time: | 30-60 days |
MOQ: | 1 set |
Production Capacity: | 30 sets /month |
Packing: | In wooden case |
Delivery Date: | 30-60 days |
Mould Service | with high qualit y ,long life ,top technic design, prompt delivery, excellent service ,reasonable price |
Technology | adopt CAD/CAM/CAE to design and use advance machines to insure the quality |
Cavity quantity | single or multi cavity |
Cavity /core material | 45#, P20, 718,718H2311, 2738. NAK80,S136 Etc according to clients requirement |
Product material | PA, PP, PE, PET, etc |
mould cycle time | 300,000 to1000,000 times |
Major equipment | Numbers (set) | Testing Equipment | |||||||||
CNC | 3 | 3D scanner |
| ||||||||
Balancing Machine | 1 | ||||||||||
Wire-cutting | 4 | ||||||||||
Grinding Machine | 2 | ||||||||||
Drilling Machine | 6 | ||||||||||
Fly cutter | 2 |
1.Quote | According to sample, drawing and specific requirement. |
↓ | |
2.Discussion | Mold material, cavity number, price, runner, payment, etc. |
↓ | |
3.S/C Signature | Approval for all the items |
↓ | |
4. Advance | Pay 50% by T/T |
↓ | |
5.Product Design Checking | We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report. |
↓ | |
6.Mould Design | We make mould design on the basis of confirmed product design, and send to customer for confirmation. |
↓ | |
7.Mold Tooling | We start to make mold after mold design confirmed |
↓ | |
8.Mold Processing | Send report to customer once each week |