user login

R ROCK BUCKET TEETH FOR HYUNDAI

1.3~1.5 USD
Min. Order: 1000 Kilogram
Trade Term: FOB
Payment Terms: L/C, T/T, WU
Supply Ability: 700 Tons/per Month
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer
Main Products: Investment Casting Wheel Disc, Cast Steel Train Coupings, Cast Iron Hydraulic Pump Part, Cast Iron Wheel Hub, Cast Iron Engine Cylinder Cover

Product Detail

Model No.: E161-3027RC
Means of Transport: Ocean
Brand Name: QM
Place of Origin: Ningbo,China
Parts Name: Bucket teeth
FOB Price: US $1.3-1.5/Kilogram
Tooth Type: R ROCK TEETH
Machine Type: Excavator,Loader etc
Material: Alloy Steel
Production Capacity: 700 Tons/per Month
Packing: seaworthy packing(wooden box or as per clients'requirements)
Delivery Date: according to the order quantity(30~35days)
Show

Product Description

1.Product Information

Name of product

 HYUNDAI EXCAVATOR BUCKET TEETH E161-3027RC 

P/N:

E161-3027RC

Applicable excavator model: 

 HYUNDAI

Process

Precision casting

Certificate

ISO9001-2008

weight:

5KG

Hardness:

46-50 HRC,

Impact strength AKV

16-22J

Material: 

Alloy steel

Design:

According to customers drawings or samples

Standard

DIN, ASTM,JIS etc

Inspection:

Factory in-house Third party inspection available upon customers' requirement

Surface treatment: 

Painting, Polishing, Heat treatment, Plaining etc.

Packaging:

Standard wooden carton or according to  your requirements

2.MECHANICAL PROPERTIES

   bucket teeth excavator parts bucket tooth point E161-3027RC  
     Material      Alloy steel
       Color      Yellow
      Part no.   Model    Weight  Hardness   TensileImpact toughness
     KG     HRC   J/cm2
     E161-3027RC   XD200     4.5    49-52   ≥1500     ≥15


3.Other Models for your reference

Hyundai RC Teeth




No

Machine No

Part No.

Weight(KG)

XD200RC(XD210)

R130/200/210,HX80

E161-3027RC

4.8

XD225RC


61Q6-31310 RC

6.7

XD290C

R290/320/235

E262-3046RC 

7.3

XD450RC

R450

61E7-04610RC

12.3

61NB-31310RC 

R450-7

61NB-31310 RC

19

61QA-31310RC


61QA-31310RC

13.6


4.Here is the list of the detail for EXCAVATOR BHYUNDAI BUCKET TEETH

P/N

TYPE

Unit/Weight  KG

Model

E161-3027/1613027

STANDAR TIP

5

XD200/210

1613027-2

4.2

XD200/210

E202-3046/2023046

7.2

XD280/290

E202-3046/2023046-2

7

XD280/290

61E7-0101


XD420

61E7-04610/XD450

9.25

XD450



5.PROCESS


1.WAX INJECTION:Wax design of the desired castings are produced by injection molding.These designs are called patterns.     

2.ASSEMBLY:The patterns are attached to a central wax stick,called a sprue to form a casting cluster or assembly.     

3.SHELL BUILDING:The shell is built by immersing the assembly in a liquid ceramic slurry and then into a bed of extremely fine sand.Up to eight layers may be applied in this manner. 

4. DEMAX:Once the ceramic is dry,the wax is melted out,creating a negative impression of the assembly within the shell. 

5.CONVENTIONAL CASTING:In the conventional process,the shell is filled with molten metal by gravity pouring.As the metal cools, the parts and gates,sprue and pouring cup become one solid casting. 

6.KNOCKOUT:When the metal has cooled and solidified,the ceramic shell is broken off by vibration or knock-out machine. 

7. CUT OFF: The parts are cut away from the central sprue using a high speed friction saw. 

8.CLEANING AND GRINDING: When the formed casting parts are finished, they will be cleaned by hand work totally.After that, all the parts will be put in to the grinding machine for spot blasting. After these operations, the metal castings becomes identical to the original wax patterns. 

9.HEATTREATMENT: Once the parts are finished by cleaning, they will be put in to heat treatment machine , in order to get a good harness and anti-wear,as well as good impact performance. 

10.PAINTING: Sprat painting method is used to paint the parts with different colors. Then they will be given special time for dry,  so that they can be kept as shining and smooth. 

11.PACKAGE: Man-made wooden carton is used for package,which is no need for fumigation. 

12.SHIPPMENT: When all these work is done, finished products is ready to ship to every corner of the world.


Post Buying Request