user login

Wheeel Loader Excavator KOMATSU Part Bucket Tooth Point 205-70-14151TL

1.3~1.5 USD
Min. Order: 1000 Kilogram
Trade Term: FOB
Payment Terms: L/C, T/T, WU
Supply Ability: 700 Tons/per Month
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer
Main Products: Investment Casting Wheel Disc, Cast Steel Train Coupings, Cast Iron Hydraulic Pump Part, Cast Iron Wheel Hub, Cast Iron Engine Cylinder Cover

Product Detail

Model No.: 207-70-14151TL
Means of Transport: Ocean
Brand Name: QM
Place of Origin: Ningbo,China
Supply Ability: 700 Tons/per Month
Brand Name: QM
Parts NO.: 207-70-14151TL
FOB Price: US $1.3-1.5/Kilogram
Machine Type: PC 300
Production Capacity: 700 Tons/per Month
Packing: seaworthy packing(wooden box or as per clients'requirements)
Delivery Date: according to the order quantity(30~35days)
Show

Product Description

1.Product Information

Name of product

Excavator part  207-70-14151TL for KOMATSU pc300

P/N:

207-70-14151TL

Applicable excavator model: 

KOMATSU

Process

Precision casting

Certificate

ISO9001-2008

weight:

 7.8KG

Hardness:

46-50 HRC,

Impact strength AKV

16-22J

Material: 

Carbon steel or Alloy steel

Design:

According to customers drawings or samples

Standard

DIN, ASTM,JIS etc

Inspection:

 Factory in-house Third party inspection available upon customers' requirement

Surface treatment: 

Painting, Polishing, Heat treatment, Plaining etc.

Packaging:

 Standard wooden carton or according to  your requirements


2.Mechanical Property (for bucket tooth point 207-70-14151TL komatsu part)


Material

Impact

Hardness(HRC)

Grade 1

Carbon Steel

20°C≥17J

47-52

-40°C≥17J

Grade 2

Alloy steel

20°C≥20J

47-52

-40°C≥14J

Grade 3

Special alloy

20°C≥22J

47-52

-40°C≥17J

For general purpose we recommend Grade 2 which is both strong and wear long. 

 

For Grade 1 material, we reduce the alloy composition,therefore the wear life is 2/3 of Grade 2.

 

And our Grade 3 is ESCO material which wear 1.3 times of Grade 2.



3.We can offer products as follows:

 

 Caterpillar: 1U3201,1U3202,6Y3222,1U3252,1U3252RC,1U3301,1U3302,9J4309,9N4302,9N4303,1U3351,1U3352, 1U3352RC, 4T2353, 9N4352, 9N4353, 7T3402, 8E4402, 1U3452, 1U3452RC, 9N2254, 9N4553, 9W8451, etc

 

Komatsu: 205-70-19570, 205-70-19570RC, 207-70-14151, 207-70-14151RC, 208-70-14152, 208-70-14152RC, 208-70-14280, 208-70-14270, 209-70-54210, 9313T30, 77Z-70-10021, etc

 

 Daewoo: 2713-9051(18S), 2713Y1221, 2731Y1217RC, 2713Y1217, 2713-9041RC, 2713-9038, 2713-9050(18SA), 
2713-9042, 3T1220, R etc

 

 Hyundai: E161-3027, E262-3046, 61E7-0101, E161-3017, E262-3027, 61E7-0100, CLZ-01ID LR, etc

 

Kobelco: BF02P, AF02L, BF01P, AF01P, 5110T-46etc

 

 Hensley: X156L, X156TL, X156WTL, X160, X220, X290, X290F, X310, X330, X370, X400, X410, X500, etc

 

 Esco: 18S, 22S, 25S, 30S, 35S, 40S, 45S, 21SYL, 27SYL, 37SYL, 47SYL, 47VIP , etc

 

Others: EC210,EC290,EC360, 53103205, 53103208, 53103209, 2713Y1217, 2713Y1219, 2713Y1221, 3T1218, 53103209, 2713Y1217, 2713Y1219, 2713Y1221, 3T1218, 3T1220, 2713-9037, 2713-9042, E161-3027, E262-3046, BF02P, etc.


PROCESS:

1.WAX INJECTION:Wax design of the desired castings are produced by injection molding.These designs are called patterns.     

2.ASSEMBLY:The patterns are attached to a central wax stick,called a sprue to form a casting cluster or assembly.     

3.SHELL BUILDING:The shell is built by immersing the assembly in a liquid ceramic slurry and then into a bed of extremely fine sand.Up to eight layers may be applied in this manner. 

4. DEMAX:Once the ceramic is dry,the wax is melted out,creating a negative impression of the assembly within the shell. 

5.CONVENTIONAL CASTING:In the conventional process,the shell is filled with molten metal by gravity pouring.As the metal cools, the parts and gates,sprue and pouring cup become one solid casting. 

6.KNOCKOUT:When the metal has cooled and solidified,the ceramic shell is broken off by vibration or knock-out machine. 

7. CUT OFF: The parts are cut away from the central sprue using a high speed friction saw. 

8.CLEANING AND GRINDING: When the formed casting parts are finished, they will be cleaned by hand work totally.After that, all the parts will be put in to the grinding machine for spot blasting. After these operations, the metal castings becomes identical to the original wax patterns. 

9.HEATTREATMENT: Once the parts are finished by cleaning, they will be put in to heat treatment machine , in order to get a good harness and anti-wear,as well as good impact performance. 

10.PAINTING: Sprat painting method is used to paint the parts with different colors. Then they will be given special time for dry,  so that they can be kept as shining and smooth. 

11.PACKAGE: Man-made wooden carton is used for package,which is no need for fumigation. 

12.SHIPPMENT: When all these work is done, finished products is ready to ship to every corner of the world.



Post Buying Request