The raw materials selected by our company are all the alloy structure steels for geographical usage producted by Bao steel plant.. After testing, both ends of the tube are thickened directly without welding. Then come to the heat treatment process of the whole pipe and the chipping edges process. After that, the pipe will be pinted with nickel phosphor that can increase the hardness of air tightness of the thread surface. Before the finished pipes are plated and packaged, a series of test have to be completed,including hardness, metallurgical structure, physical performances,etc.
The welding between drill pipe and tool joint is machining with Friction welding machine. The welding process by means of computer control is swift and steady going. Weld zone is quenched and tempered through induction heating process, which is controlled real time by computer.
Packaging Detail: | according to the seaworthy packing |
Delivery Detail: | 30 days |
- Section Shape: Round
- Outer Diameter: 65 - 168 mm
- Place of Origin: Henan, China (Mainland)
- Secondary Or Not: Non-secondary
- Application: Fluid Pipe
- Certification: API
- Surface Treatment: Other
- Pipe body material:DZ40 DZ50 R780 G105
Tool joint material:40Cr 45Mn