Min. Order: | 5 Metric Ton |
---|---|
Payment Terms: | L/C, T/T, WU |
Supply Ability: | 2000 Metric Ton/Metric Tons per Month |
Place of Origin: | Henan |
Location: | Zhengzhou, Henan, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | Drill Pipe, Tinplate, Galvanized Coil, Steel Pipe, Round Steel Bar |
Model No.: | S355JR |
---|---|
Means of Transport: | Ocean |
Standard:: | AISI,ASTM,BS,DIN,GB,JIS |
Steel Grade:: | S355JR |
Thickness:: | 100mm-350mm |
Model Number: | SS400 |
Surface Treatment:: | Coated,Shot blasting and Printing |
Width: | 1000mm--3000mm |
Ultrasonic Test:: | available . |
Application: | Boiler Plate |
Type: | Steel Plate |
Place of Origin: | Henan, China (Mainland) |
Production Capacity: | 2000 Metric Ton/Metric Tons per Month |
Packing: | In bundle or Container |
Delivery Date: | 25--30 days |
AISI/SAE | DIN | W.Nr. | AFNOR | JIS | BS | SIAU | GB,YB |
1045 | CK45 | 1.1191 | XC48 | S45C | - | - | 45 |
Grade | C | Si | Mn | P | S | Cr | Ni | Mo | Cu | ||||||||
45 | 0.42-0.50 | 0.17-0.37 | 0.50-0.80 | ≤0.035 | ≤0.035 | ≤0.25 | ≤0.30 | - | ≤0.25 | ||||||||
1045 | 0.43-0.50 | - | 0.60-0.90 | ≤0.040 | ≤0.050 | ≤0.05 | - | - | - | ||||||||
1.1191 | 0.42-0.50 | ≤0.40 | 0.50-0.80 | ≤0.030 | ≤0.035 | Cr+Ni+Mo≤0.63 | - | ||||||||||
Forging | Normalization | Subcritical annealing | Isothermal annealing | Hardening | Tempering |
1100~850* | 840~880 | 650~700* | 820~860 600x1h* | 820~860 water | 550~660 |
Material: | C50 C45 carbon steel plate |
Process: | EAF + LF + VD + Forged + Heat Treatment (optional) |
Diameter: | 16mm-500mm; length 3000mm-12000mm |
Thickness: | 10 – 300mm; Width 200- 2300mm |
Heat treatment: | Normalized / Annealed / Quenched / tempered |
Delivery condition: | Hot rolled or forged +Rough machined (black surface after Q/T)+ Turned (optional) |
Technical Data: | According to the customer's requirement of Chemical Composition, PhysicalProperties and Mechanical Testing |
Test: | Ultrasonic test according to SEP 1921-84 G3 C/c |
Delivery time: | 10-15 days after advanced payment |
Payment: | TT or LC |