user login

Injection Turnover Box Mould

1.0~2.0 USD
Min. Order: 1 Set/Sets
Payment Terms: T/T
Supply Ability: 30sets per month
Place of Origin: Zhejiang

Company Profile

Location: China (Mainland)
Business Type: Manufacturer

Product Detail

Means of Transport: Ocean, Air
Production Capacity: 30sets per month
Packing: wooden case
Delivery Date: about 45-60
Show

Product Description

 1. Products Materials: PP,PE,ABS,PCetc.

2. Base: LKM, HASCO, DEM ect .

3. Main Steel: P20,S136 ,718,738H,2738,2344,NAK80 ect.

4. Qty: Single/multi cavity
5. Hardness of steel: 28--52 HRC.
6. Lead time: About 45-60 days.
7. Mould lifetime: 300,000 to 500,000 shoot.
8. Hot Runner:YUDO, Hasco, Master.
9. Package:Wooden Case.
10.Transport: By Sea or Air.
11.Payment: 40%deposit by TT when we sign the contract
            40%by TT after the first testing
            20% by TT before delivery
Welcome to provide 2D drawing or 3D drawing to us.
Please do not hesitate to contact me if you have any question.
Post Buying Request