user login

hydraulic carbon steel piston accumulator

500.0 USD
Min. Order: 50 Set/Sets
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 2000 sets per moth
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer, Trading Company, Service

Product Detail

Model No.: HXQ series
Means of Transport: Ocean, Land
Product Type: Others
Machine Type: Others
Brand Name: Fenghua Chaori
material: carbon steel
color: black
volume: 0.49L~250L
installation: vertical
medium:: oil
Production Capacity: 2000 sets per moth
Packing: wooden case
Delivery Date: within 35 working days
Show

Product Description

Product name: piston accumulator


hydraulic carbon steel piston accumulator
                    piston accumulator



1. Model codeaccumulator.


                   HXQ - # - # / # - #           
                      1       2   3   4    5


1. product name: piston acumulator
2. connection type: L-threaded   F-flanged
3. nominal volume: 0.49L`250L
4. nominal pressure: 10Mpa   20Mpa   31.5Mpa
5.medium: H-hydraulic oil   R-emulsion

2. Structure and dimension.

hydraulic carbon steelvpistton accumulator


hydraulic carbon steelvpistton accumulator


3. Installation.

(1) Accumulator shall be instaled vertically with the gas valve upright.Inspection space shall be related near gas valve.
(2) Accumulator shall be fixed tightly on the supporter or wall.
(3) When used for buffering and absorbing the flactuation,accumulato shall be placed near the fluctuation source.
(4) Check valve shall be placed between accumulator and hydraulic pump to prevent return flow of oil for the accumulator when the electric machine of pump stops working.
(5) Stop valve shall be placed between accumulator and pipe system to be used in gas charging,speed adjusting or long term stopping.
(6) Welding shall not be applied in fixing the accumulator.

4. Working production.

hydraulic carbon steelvpistton accumulator


hydraulic carbon steelvpistton accumulator


hydraulic carbon steelvpistton accumulator


5. Inspectin and repair.

)Inspection of leakage.

After installation,check the gas pressure in bladder every week.A month later,check every month,half a year later,cjeck every half year.

Post Buying Request