user login

High standard printed circuit board electronic pcba

57.0~200.0 USD
Min. Order: 1 Square Meter
Trade Term: FOB
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 1000square meter/per day
Place of Origin: Guangdong

Company Profile

Location: Shenzhen, Guangdong, China (Mainland)
Business Type: Manufacturer
Main Products: PCB

Product Detail

Model No.: 7410klo
Means of Transport: Ocean, Air, Land
Max pane size: 34"*25"
Independence tolerance: +/-18%
Aspecr Ratio: 10:7
Layer count: 1-24
Solder mask abrasion: ≥10H
Gold finger: Ni: 80~250u", Au: 1~5u"
Warp and twist: ≤0.55%
Via plug: Max via size: 24mil (0.6mm)
Peel Strength: 1.4N/mm
Certification: UL/SGS/ROHS
Production Capacity: 1000square meter/per day
Packing: Inner vacuum and plastic package,outer carton box package
Delivery Date: 3~10days
Show

Product Description

 
Specifications
****Brief description:
1) Gas Hood/cooker hoodcontroller
2) Three air blowing speed options
3) LED lightingfunction
***Function details:
1) Four hobs controller
2) Touch button screen.
3)Safety child lock function.
4) Timing function
5) Comply with RoHS & REACH standard
6) Passing EMC & LVD test, applicable to counties where the voltage is
unstable
7) Lead Free
*** YINGKE SMT ProductionFlow:
Material Receiving&IQC→ Stock → Materialto SMT→ Solder Paste/Glue Printing → Chip Mount → Reflow → 100% VisualInspection → Automated Optical Inspection (Precision AOI machine) → QC Sampling→ SMT Stock → Material to PTH → Plated Through Hole on production line → WaveSoldering → Touch Up → 100% Visual Inspection→ In-Circuit Test (ICT) → FinalAssembly → Functional Test (FCT) → Packing → Storage → Shipping
*** Requested information for PCBassembly:
1. Gerber file &Bom list ifpossible
2. PCB sample
3. Testing method & Testingfixture
4.Quantity
***Research & Technology capability
1) Over 50 engineers, including hardware engineer & software engineer, who can offer technical assistant for developing your new projects, or improving your old products.
2) EMC test room and all other kinds of test machine to ensure the quality for each design.
3) High efficiency to shorten the sample lead time. Normally it will take 4 weeks on developing one PCBA for small home appliance, and 8-10 weeks on developing the PCBA for the white goods, such as PCBA for washing machine, refrigerator, and air conditioner.
Advanced ProductionEquipment
electronic PCB manufacturer and pcb assembly electronic PCB manufacturer and pcb assembly
Product HighQuality Perfect
electronic PCB manufacturer and pcb assembly
electronic PCB manufacturer and pcb assembly
electronic PCB manufacturer and pcb assembly electronic PCB manufacturer and pcb assembly
Meet your need is ourgreatest pursuit .If you are looking for a  pcb board manufacturerinchina,Pleasegive us your files ofpcb for a quote (Gerberfiles and specification),I will reply email in 3hours. Youalso cancontact usby .
1.Advanced production lines andprofessional staff.
2.Honesty credibility in china'stop.
3.Competest price but highquality.
4. One-stopservice.
5.Delivery ontime.
electronic PCB manufacturer and pcb assembly
electronic PCB manufacturer and pcb assembly
Post Buying Request