user login

RAILWAY HIGHWAY CROSSING TOWER FOR POWER TRANSMISSION

1200.0~1400.0 USD
Min. Order: 3 Ton
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 30000 tons/year
Place of Origin: Shandong

Company Profile

Location: Qingdao, Shandong, China (Mainland)
Business Type: Manufacturer
Main Products: Substation Structure, Wind Tower, Wind Turbine, Camouflage Tower, Power Transmission Line Tower

Product Detail

Model No.: MGP-RC001
Means of Transport: Ocean, Air, Land
Brand Name: MEGATRO
Production Capacity: 30000 tons/year
Packing: export standard package
Delivery Date: 15-30 days against deposite
Show

Product Description

Railway safety is a crucial aspect of rail operation the world over. However, sometimes power transmission line system seems conflict with railway transport layout. Especially at railway or road, overhead transmission lines are necessary for power transmission and distribution.
The main supporting unit of overhead transmission line is transmission tower. Cross-railway transmission towers have to carry the heavy transmission conductor at a sufficient safe height from ground. In addition to that all towers have to sustain all kinds of natural calamities. So transmission tower designing is an important engineering job where all three basic engineering concepts, civil, mechanical and electrical engineering concepts are equally applicable.
MEGATRO is one of the few manufactures who assemble a face of every railway highway crossing tower for power transmission.This attention to quality may not be the cheapest process but it does insure every tower meets our high standards of quality.And it helps to reduce on-site construction cost due to mismatched assemblies.
After fabrication all railway highway crossing tower for power transmission are delivered to the galvanizing facility to be Hot Dip Galvanized.Towers are processed through the facility by Caustic Cleaning, Pickling, and then Fluxing.These strict procedures insure years of maintenance free towers.
MEGATRO's railway highway crossing tower for power transmission systems can accommodate a variety of cross-arm.MEGATRO also offers a wide variety of accessories and mounts.
Availability size: Based on the customer's requirements.
Material: Chinese material or as per clients requirement
Package: both parties discuss before delivery
Terms of Payment: L/C, T/T
Minimum Order Quantity: 50tons
Port of Loading: Qingdao Port
Lead Time: one month or based on the customer's needs
Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to the Chinese Standard or other standard which clients can accept.
Post Buying Request