Dual action microfiber flip mop with Chenille +aluminum+ PP
1) Made of PP, Aluminum, Chenille. |
2) Especially for floor cleaning. |
3) The refill is easily to be replaced. |
4)Telescopic alu handle makes floor cleaning more easier. |
5)The refill is easily to be replaced and durable. |
6)The chenille has good absorbency of water and detergent. |
7)The microfiber refill can remove the dirt on the floor quickly and completely. |
8)One side for duster and another one for wet cleaning. |
Dual action microfiber flip mop with Chenille +aluminum+ PP
Item No | MC10-4309-71 |
Size | 40*10cm |
Material | PP |
Hanlde | Telescopic alminum handle |
Length | 1280mm |
Packing | Color card |
Cubage | 0.0904 m3 |
20ft | 7080 pcs |
40ft | 14880 pcs |
40HQ | 17280 pcs |
Chenille microfiber flip mop with Telescopic aluminum handle
Chenille microfiber flip
mop
Describe:
1)Material: microfiber or chenille or according to your request
2)Color:white,blue or any other whatever you like.
3)Introduction:
Use dry: Attracts and holds dirt, dust and hair for a thorough clean.
Use damp: Cleans effectively without chemicals. To use damp, mist the floor using a spray bottle or remove pad off of base, rinse and wring by hand, and re-attach. Pad is machine or hand washable up to 100 times. Lay flat to dry.
Refills available :Change refill every three to six months for best results.
4)Advantages:
(1)Excellent liquid absorbency and remarkable cleaning ability.
(2) launderable and can be cleaned and reused countless times
(3) a long service life
In-process management procedures |
1.According to production requirements,logistics is resposible for establishing EHS requirements,rational layout of the production enviroment,production department to maintain the production according to 5S management requirements,to a special enviromental in equipment or procedures,need to have a formal document specify that the staff must strictly enforce,on the anti-static requirements of the process and location,must operate strictly in accordance with the guidance document and the corresponding documentation for operation. |
2.Engineering resposible for equipment maintenance, specific maintenance contents fefer to production equipment control procedures. |
3.Production resposible for assist materials control Department of the online materials,and manage scrap units. |
3.Production control production line output according to plans,use the "production internal maintenance form"record and track human,machines,materials and technics abnormity in produce process;quality control/Engineering Department make a patrol inspection on the production line to control the production process quality.According to the process and equipment characteristics,the production process will be devided into general process,key process,and special process for different levels of control. |
4.1 General process control |
4.1.1 Before production,should confirm raw materials preparation,equipment status,operation guide books,staff skills. |
4.1.2 Strictly operate in accordance with the guidance books,through the operator self-inspect,multi- inspect and QA patrol inspect for real-time monitoring quality. |
4.1.3 The feedback of fluctuate process:promote production management principles. |
4.1.4 The defective in prodction operate according to "Defective control procedue" |
4.1.5 Record and stat production status |
4.2 Key process control |
According to product characteristics,the company confirm the fire detector calibration processes and functions of mobile detector test processes for key processes. |
4.2.1 Pre-production with the test samples could confirm whether the equipment used for the production and make records. |
4.2.2 Quality selective inspect of the fire detector sensitivity to control the accuracy of calibration. |
4.3 Special process control |
According to product characteristics,the company confirm SMT,reflow solder,hands and wave soldering process for the special process and the specific special control refer to "special process control procedure". |
5.Production process should be operational by guide book guide,operation guide book shall be in writing in pictures combined description code,and pay attention items and quality standards. |
6.Quality records requirement in the process should follow the related contents of Record control procedure". |
7.After the end of production,after the inspection and acceptance by quality control,the packing storage,warehouse confirm quantities and arrange every lot intergated qualified products to meet the quantities request of shipment orders.If the inventory were stored for more than three months and need to ship,the materials control department supply appliactions,after the production rework,the inspector re-inspect,and passing inspection,then shipment. |
Professional supervision Loading


Carton Fair we've attended
Company Certificates

Workshops review:
Company tenet:
With the mission of customers first,quality oriented,Ningbo Master Clean Commodities Co.,Ltd. pays special attention to technology innovation and quality stability,and offer best quality products and services to customers and clients warmheartedly to satisfy customers.
PRODUCT DESPRITION |
Ningbo Master Clean Commodities Co.,Ltd. have more than 10-year experiences on cleaning products. We are a typical China supplier and have worked for home products. We also have factories in China in order to meet customers' needs. |
Name | Value |
Brand | MASTER CLEAN |
Production Capacity | 10000 Piece/Pieces per Month |
Material | Chenille and microfiber |
Terms | FOB Ningbo CHINA |
Place of Origin | China |
Feature | ECO-friendly,Stocked |
Payment terms | 30% deposit before we make the production, 70% balance paid after we finished the order. |
Order delivery | 30days after we recieve the deposit |
Packing | Colour box,24pcs/ctn |
Shipment means | by sea, by air, by express etc. |