user login

Plastic Window squeegee cleaner with PP and ALU and Rubber

Min. Order: 2000 Piece/Pieces
Trade Term: FOB
Payment Terms: L/C, T/T, WU
Supply Ability: 20000 Piece/Pieces per Month
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer, Trading Company, Agent, Service

Product Detail

Model No.: MC20-4512-11
Means of Transport: Ocean, Air, Land
Usage: Window,for window or surface of table-board
Handle Material: Plastic
Feature: Eco-Friendly,Stocked
Material: PP and Aluminum and Rubber
Color: Blue
Style: Popular product
Type: Window cleaner
Packaging: Color paper
Brand Name: MASTER CLEAN
Production Capacity: 20000 Piece/Pieces per Month
Packing: Color card ;48pcs/ctn
Delivery Date: 30Days received after customer deposit
Show

Product Description

Plastic Window squeegee cleaner with PP and ALU and Rubber

Specifications:

Window squeegee cleaner:

1.Window squeege is made of pp ;rubber; Aluminum.

2.Make cleaning windows easier.

Window squeegee Wipe cleaner:

1.Window squeege is made of pp TPR Aluminum.

2.Window squeegee is designed to clean the smooth surface like glass or surface of talbe-board.

3.Rubber strip is strong flexibility.

4.window squeegee is used widely window glass and cleaning.

5. replace the rubber easily.

Item NoMC20-4512-11
Size45cm
MaterialPP.ABS;ALU;rubber
Packingcolor card +pp bag;48pcs/ctn
Cubage0.047 m3
20ft26544 pcs
40ft55152 pcs
40HQ69456 pcs



Plastic Window squeegee cleaner with PP and ALU and Rubbr
Plastic Window squeegee cleaner with PP and ALU and Rubbr


In-process management procedures
1.According to production requirements,logistics is resposible for establishing EHS requirements,rational layout of the production enviroment,production department to maintain the production according to 5S management requirements,to a special enviromental in equipment or procedures,need to have a formal document specify that the staff must strictly enforce,on the anti-static requirements of the process and location,must operate strictly in accordance with the guidance document and the corresponding documentation for operation.
2.Engineering resposible for equipment maintenance, specific maintenance contents fefer to production equipment control procedures.
3.Production resposible for assist materials control Department of the online materials,and manage scrap units.
3.Production control production line output according to plans,use the "production internal maintenance form"record and track human,machines,materials and technics abnormity in produce process;quality control/Engineering Department make a patrol inspection on the production line to control the production process quality.According to the process and equipment characteristics,the production process will be devided into general process,key process,and special process for different levels of control.
4.1                                                             General process control
4.1.1 Before production,should confirm raw materials preparation,equipment status,operation guide books,staff skills.
4.1.2 Strictly operate in accordance with the guidance books,through the operator self-inspect,multi- inspect and QA patrol inspect for real-time monitoring quality.
4.1.3 The feedback of fluctuate process:promote production management principles.
4.1.4 The defective in prodction operate according to "Defective control procedue"
4.1.5 Record and stat production status
4.2                                                         Key process control
According to product characteristics,the company confirm the fire detector calibration processes and functions of mobile detector test processes for key processes.
4.2.1 Pre-production with the test samples could confirm whether the equipment used for the production and make records.
4.2.2 Quality selective inspect of the fire detector sensitivity to control the accuracy of calibration.
4.3                                              Special process control
According to product characteristics,the company confirm SMT,reflow solder,hands and wave soldering process for the special process and the specific special control refer to "special process control procedure".
5.Production process should be operational by guide book guide,operation guide book shall be in writing in pictures combined description code,and pay attention items and quality standards.
6.Quality records requirement in the process should follow the related contents of Record control procedure".
7.After the end of production,after the inspection and acceptance by quality control,the packing storage,warehouse confirm quantities and arrange every lot intergated qualified products to meet the quantities request of shipment orders.If the inventory were stored for more than three months and need to ship,the materials control department supply appliactions,after the production rework,the inspector re-inspect,and passing inspection,then shipment.


Professional supervision Loading
Flat Microfiber Mop with three sections steel handle

Flat Microfiber Mop with three sections steel handle

Carton Fair we've attended
Chenille Flat Mop with Synthetic Cloth Mop Head

Company Certificates

Chenille Flat Mop with Synthetic Cloth Mop Head

Chenille Flat Mop with telescopic handle 40*10cm frame sizeChenille Flat Mop with telescopic handle 40*10cm frame size

Workshops review:
Chenille Flat Mop with Synthetic Cloth Mop Head

Company tenet:
With the mission of customers first,quality oriented,Ningbo Master Clean Commodities Co.,Ltd. pays special attention to technology innovation and quality stability,and offer best quality products and services to customers and clients warmheartedly to satisfy
Post Buying Request