Min. Order: | 1 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T, paypal, WU |
Supply Ability: | 30000 square meter/month |
Place of Origin: | Guangdong |
Location: | Shenzhen, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | PCB.PCBA |
Model No.: | Multilayer PCB-4 |
---|---|
Means of Transport: | Ocean, Air, Land |
Number of Layers: | 4-Layer |
Brand Name: | K-better |
Base Material: | FR4.CEM-1.CEM-3 |
Copper Thickness: | 0.5-3.0oz |
Board Thickness: | 0.2-3.0mm |
Min. Hole Size: | 0.25mm |
Min. Line Width: | 0.25mm |
Min. Line Spacing: | 0.15mm |
soldermask color: | green.black,yellow.blue.white.red.etc |
other service: | pcb/pcba copy.board testing.parts purchase |
Production Capacity: | 30000 square meter/month |
Packing: | vacuum packing |
Delivery Date: | 3-7 days |
ITEMS | CAPACITY | |
Layer | 2-20 | |
Base Material for PCB | FR4.AL.CEM-1.CEM-3.high TG180 | |
Inner layer line width/space | 4mil | |
Min inner-layer pad | 5min | |
Min core thickness | 4min | |
Thickness of finished panel | 0.2-4.0mm | |
Surface treating process of inner-layer | Black/brown oxide | |
Min drilling diameter | 0.2mm | |
PHT hole copper thickness | 0.4-2mil | |
Outer layer line width/space | 4mil | |
Type of solder mask | Taiyo PSR2000,NSR-9000 and others | |
Thickness of soler mask | Line end | 0.4-1.2mil |
Line comer | ≥0.2mil | |
On substrate | ≤finished cu thickness+1.2mil | |
Surface treatment | HAL/HAL lead free,gold finger,OSP,slive,gold | |
Other process | PEEABLE, AD | |
Soler mask color | Red.blue.yellow.black.white.etc. | |
Test | E-Testing | |
Certification | ISO9000,CE,ROHS | |
Lead time | For sample:1-7 days | |
For opening mould:3-7 days | ||
For mass production:5-10 days | ||
Packing | Inner packing: vacuum packing | |
Outside packing: Standard carton packing |
Lead time for sample | 2-3 days for single-sided board |
4-5 days for double-sided board | |
6-7 days for multilayer board | |
24-48 hours for urgent | |
Lead time for Opening Mould | 3-5 days for normal mould |
5-7 days for hard mould | |
Lead time for Mass production | 5-7 days for single/double sided board |
7-10 days for multilayer board |