user login

BS6323 Part 4 CFS 3 tubes

1500.0~3000.0 USD
Min. Order: 1 Metric Ton
Trade Term: CIF
Payment Terms: L/C, D/P, D/A, T/T
Supply Ability: 500Ton/ Month
Place of Origin: Jiangsu

Company Profile

Location: Suzhou, Jiangsu, China (Mainland)
Business Type: Manufacturer
Main Products: Hydraulic Fluid Line Tube, Phosphated Metric Steel Tube, BA Steel Tube, Zinc Coated Steel Tube, High Pressure Oil Tube

Product Detail

Means of Transport: Ocean, Air, Land
OD: 3-80MM
WT: 0.5-10MM
Technique: Cold Drawn or Cold Rolled
surface treatment: light oiled, phosphated or galvanized
Name: BS6323 Part 4 CFS 3 tubes
HS Code: 7304319000
Production Capacity: 500Ton/ Month
Packing: plastic film and knittings
Delivery Date: 15working days
Show

Product Description

 
BS6323 Part 4 CFS 3 tubes
Seamless and welded steel tubes for automobile mechanical and general engineering purposes
Part 4: Specific requirements for cold finished seamless steel tubes

Method of manufacture
The tubes shall be manufactured by a seamless process and shall be cold finished.
It is permissible for cold finished tubes to have on internal or external surfaces an adherent layer of
residual lubricant originating from the drawing process. If phosphate or other residues are
detrimental to subsequent processing, then their removal shall be the subject of an agreement
between the manufacturer and the purchaser.

Delivery condition
The tubes shall be supplied in one of the following delivery conditions (see Table 3 in BS 6323-1:1982).
a) Cold finished/hard (cold finished as drawn): BK;
b) Cold finished/soft (lightly cold worked): BKW
c) Annealed: GBK
d) Annealed (including de-scaling): GZF;
e) Normalized: NBK
f) Normalized (including de-scaling): NZF.

Post Buying Request