user login

Pressbrake Steel Sheet Bending Machine

6650.0~53650.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB
Payment Terms: L/C, D/A, T/T, WU
Supply Ability: 60 Set/Sets per Month
Place of Origin: Jiangsu

Company Profile

Location: Nantong, Jiangsu, China (Mainland)
Business Type: Manufacturer
Main Products: Shearing Machine, Bending Machine, Plate Rolling Machine, Section Bending Machine, Hydraulic Ironworker

Product Detail

Model No.: WC67Y-300T 6000
Means of Transport: Ocean, Land
Machine Type: Coiling Bending Machine
Raw Material: Sheet / Plate Rolling
Material / Metal Processed: Stainless Steel
Power: Hydraulic
Automation: Manual
Extra Services: Machining
Bending thickness: 6mm
Bending width(Length: 6000mm
Backgauge accuracy: 0.1mm
System: T10 NC system
Production Capacity: 60 Set/Sets per Month
Packing: PVC plastic,with steel pallet
Delivery Date: Within 25-45 days after recepit deposit
Show

Product Description

Name:

Press brake machine,Sheet bending machine

WC67Y-300/6000 hydraulic plate press brake
Adopt the welding structure of steel plate; Vibrate, timeliness eliminate stress, machine tool has very good rigidity and stability; Entire frame rigidity work, is steady, safely reliable, operate convenience; through the cooperative control of electric and hydraulic system, reach ideal, fold curved effect.

1. Slide Block    WC67Y-300/6000 hydraulic plate press brake adopt hydraulic transmission, the part of slide block forms from slide block, oil cylinder and the mechanical trimming structure of link stopper. Control oil cylinder, fix on frame, make piston (rod) drive the about sport of slide block through hydraulic pressure.

2. Worktable   From before worktable, the button box is controlled , make motor drive stopper, around move , and from figure, show the distance that moves , its minimum reading is 0.10 millimeters( around location have route switch limit position).

3. Synchronous system   This machine from turn the mechanical synchronous organization of axle and the composition of move about arm, structure is simple, it is reliable that property is stabilized, synchronous precision is high. Mechanical link stopper from generator regulation, counter shows value.

4. Back gauge installation     Back gauge is adopt motor transmission , drive two silk rod synchronism through sprocket to move, counter show that back gauge is expected size, can is trimming by hand.

ⅱ. Main technical parameter

No.

Name

Numerical Value

Unit

Remarks

1

Pressing force

3000

KN

2

Working length

6000

mm

3

Distance between uprights

4850

mm

4

Throat depth

400

mm

5

travel of slide block

200

mm

6

Max opening height between the worktable and the ram

435

mm

7

Main motor power

22

Kw

8

Oil pump

Type

63MCY14-1B

ⅲ. Install environment of machine

1Power & Voltage:380V  50Hz

2Working temperature: 0℃+40℃

3Working environment: Clean

ⅳ. Main structure and performance of machine

1Design the machine according to JB/T2257.2-92 and GB/T14349-93, all parts of the machine use CAD/CAE/CAM to be physical designed, fully guarantee every parts' strength and stiffness of structure.  

2Integral steel plate welded structure, rack is thick, rigidity is high, damping is strong.

3The machine consists of rack, working table, slider, main cylinder, back gauge and so on, Perfect design and manufacturing process can effectively assure precision of manufacturing and using. The manufacturing process of main structure:

Material storage      Physical and chemical inspection     plate pretreatment(burnish and rust clean)      CNC flame cutting      cutting welded joint      

Group welded      vibrate aging      large boring-milling machine etc. machinery manufacturing      assemble product

4. Dynamic type on bending design, working stability, easy and safe operation.

5. Rack, slide, working table and other parts of machine all use CNC large boring miller one time clamping and refined processing, ensure the requirement of geometric accuracy.

6. Guide rail of machine use advance self-lubricant material, no need to usually lubricate.

    7. Design stiffness of working table, column, beam and slide is high, working table and slide deformation is small when bending, product have good linear and angular coherence.

    8. Slide has pressure maintain time delay function on the lower stop point, ensure precision of working pieces.

ⅴ. Hydraulic system

1Use bending machine hydraulic system manufactured by Shandong Taifeng hydraulic co.,Ltd.

2Seal elements use products of Japan Valqua.

ⅵ. Electrical control system

1. Electrical elements use products of Suzhou Siemens.

2. Equipped with mobile foot switch operation, have emergency stop function.

ⅶ. Mould

Mould can be designed by users technological requirements.

ⅷ. Back gauge

The back gauge has the characteristics of high precision, strong rigidity, fast speed, large carrying.

ⅸ. Main parts

1. Main electrical elements:Siemens

2\Hydraulic valves:Omega-USA;

3\Sealing elements:VALQU-Japan;

4\Main motor:Siemens

ⅹ. Technical Information

After the execution of contract, the supplier need supply buyer correlation technique

1. The foundation of the machine

2. Operating instruction manual

3. Electric drawing

4. Vulnerable parts drawing

5. Main purchased parts list

6. Certificate of compliance

7. Packing list(include attachments with machine)

Ⅰ. Standard attachments of machine

1Mobil foot switch             one set

2Socket head wrench         one set   

3Foundation bolt              four pieces

4Product operation manual     one copy

5Certificate of quality           one copy

Ⅱ. Date of delivery: 45 days after receiving the first payment (execution of contract).

Ⅲ. After-sale service:

Our company is committed to the development of new products, improve product quality,also establish relatively perfect after sale service network at home and abroad, so that we can provide better and more convenient service.                                   

Installation and debugging of machine, according to the supplier's foundation drawing, the buyer is responsible for the foundation construction. The suppliers is responsible for installation and debugging of machine, the buyer coordinate and provide required lifter for installation. The supplier should inform the buyer required accessory for installation before delivery.

1After machine is completed in the factory, the supplier inform the buyer to come to the factory for inspection in time, then the supplier can delivery the machine after inspection.

2. In the process of installation and debugging in buyer's factory, engineer of the supplier should train the technicist of buyer for free.

3. The machine supplied by the supplier, implementation three guarantees since the date of sale, the quality guarantee period is one year after acceptance of the machine. During the guarantee period, the damage of the components not cause by user, we will change the components for free(Wearing parts are not covered under warranty). After the guarantee period, we will supply overall favorable technical support and accessories.

4. The supplier should supply door to door service, should reply the buyer in 24 hours and reach the buyer's factory in 72 hours after receive buyer's quality report.

Post Buying Request