user login

cold drawn Carbon Seamless steel pipe with bare surface and packing

656.0~780.0 USD
Min. Order: 10 Ton
Trade Term: FOB
Supply Ability: 10Ton
Place of Origin: Hebei

Company Profile

Location: Cangzhou, Hebei, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: API 5L Cold Drawn Seamless Steel Tube, Hot Galvanized Seamless Steel Pipe, Seamless Steel Pipe, ASTM A53/A106 Black Sch40-Sch160 Seamless Steel Tube, Astm A106 Seamless Tube

Product Detail

Model No.: 1/2"-14"*SCH20-SCH160
Material: A106B,A53B.
OD: 1/4"*14"
WT: SCH20-SCH40-SCH80-SCH160
Length: 5-12m
Surface: plstic cap and black paint
Ends: plain or bevelled
shape: round
Item: Seamless steel pipe
MOQ: 10Ton
technique: BK/NBK/Cold drawn
Production Capacity: 10Ton
Packing: Plastic and black paint
Delivery Date: 20days.
Show

Product Description

1.Material:10#/20#,GB3087/GB5310,A106B.A53B,
2.OD:1/4"-14"
3.WT:SCH40-SCH160
4.API5L,API5CT


Standard
API 5CT, 5L; ASTM, BS, JIS, DIN
Steel Grade
API 5L Grade B/ASTM A106B, BS 1387
O.D.
13.7-355mm(1/4"-14")
W.T.
2-354mm(SCH20-SCH160)
Length
5m--12m
End protection
plastic caps
Outside Coating
black painting, anti-corrosion oil, galvanized or as per required by customer
Packing
Wrapped in bundles by steel strips
Delivery
within 20 days
Third party inspection
SGS/BV
Certificates
API 5CT-0865, 5L-0593, ISO9001:2000
Production Capacity
Three mills with full production capacity, 400,000tons per year
Delivery time
20 days
Qualification
independent import and export qualifications
Main market
Asia, India, Middle East, America, Europe
Standard
API5L,API5CT,ASTM A106,ASTM A53,ASTM A179,
ASTM A192,ASTM A210,DIN 17175,DIN 1629/DIN 2448
Material
A,B,X42,X46,X52,X56,X60,X65,X70,X80,N80,
L80,J55,K55,P110,H40,ST 35.8/45.8
Packing
In buddles,Varnish coating,Ends can be bevelled
or square cut,End capped
Certification
ISO9001.2000,, API, Mill Test Certificate EN10204/3.1B
Third Party Inspection
BV, SGS, Lloyds
Payment
TT 20% or 100% Irrevocable LC at sight
Delivery
FOB / CFR / CIF
Supply Ability
30000MT/month
Delivery Lead Time
Within 20 days after the receipt of L/C

cold drawn Carbon Seamless steel pipe with bare surface and packing

cold drawn Carbon Seamless steel pipe with bare surface and packing

cold drawn Carbon Seamless steel pipe with bare surface and packingcold drawn Carbon Seamless steel pipe with bare surface and packing
Post Buying Request