Min. Order: | 5 Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 200MT/DAY |
Place of Origin: | Hebei |
Location: | Cangzhou, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | API 5L Cold Drawn Seamless Steel Tube, Hot Galvanized Seamless Steel Pipe, Seamless Steel Pipe, ASTM A53/A106 Black Sch40-Sch160 Seamless Steel Tube, Astm A106 Seamless Tube |
Model No.: | 1 1/2"*SCH40 |
---|---|
Means of Transport: | Ocean, Air, Land |
NAME OF PART: | HOT-DIPPED GALVANIZED STEEL PIPE 1 1/2"*SCH40 |
O.D: | 20MM-219MM |
W.T: | 0.5MM-11.75MM |
LENGTH: | 5.8M,6M |
SURFACE: | ZINC COATING |
BRAND NAME: | ZEWO PIPE |
Production Capacity: | 200MT/DAY |
Packing: | BUNDLES TIED WITH STEEL STRIPS,SEAWORTHY PACKING,CONTAINERS |
Delivery Date: | 15-20 DAYS AFTER SIGNING THE CONTRACT |
Product name | |
Material | Q195,Q215,Q235,Q345 |
Size | |
a) Inside diameter | EN15 |
b) Thickness | 2.45-2.8mm |
c) Length | 3m, 5.8m, 6m or as customers' requests. |
d)W.T/m | 1.19~1.34kg |
Surface finished | Hot-dip galvanized, Pre-galvanized, Electro galvanized,G.I pipe |
Standard | BS1139,BS1387-BS1385,ASTMA53B,ASTM A500,API5L,API5CT,DIN2440,EN10219 |
Usage | Natural gas, gas threading pipe for pipeline in constructions. |
Package | Our products can be packaged in bulk, bundles, or pvc; we also can package as customers' requirements. |
Payment | 50% T/T Deposit + 50% T/T Balance, 30% T/T Deposits + 70% L/C Balance |
Delivery time | 15-30 days |
Others | We can do special szies as customers' requests. |