Min. Order: | 10 Metric Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 1000 ton per month |
Place of Origin: | Hebei |
Location: | Cangzhou, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | API 5L Cold Drawn Seamless Steel Tube, Hot Galvanized Seamless Steel Pipe, Seamless Steel Pipe, ASTM A53/A106 Black Sch40-Sch160 Seamless Steel Tube, Astm A106 Seamless Tube |
Model No.: | round steel pipe |
---|---|
Means of Transport: | Ocean |
Technique: | Welded |
Brand Name: | ZEWO |
Specification: | BS 1387, JIS G3463-2006, GB 5310-1995, GB 3087-1999, DIN 1626, DIN 1629/3, ASTM A106-2006, ASTM A53-2007, API 5CT, API 5 |
Grade: | 10#, 20#, 45#, 16Mn, A53(A,B), A106(B,C), St37, St52, St42, Q235, Q345, Q195 |
Outer Diameter: | 21.3 - 508 mm |
Thickness: | 1.5 - 16 mm |
Length: | 5-12m |
Usage: | Fluid Pipe |
Surface Treatment: | black oil or light varnish |
Production Capacity: | 1000 ton per month |
Packing: | Export standard package |
Delivery Date: | within 30 days |
Commodity | Steel Pipe(Black painting or oiled, galvanized coated) | ||
Shape | Square Pipe | ||
Outer Diameter | 10.3-1400mm | 10*10-600*600mm | 10*20-600*800mm |
Wall Thickness | 0.6-60mm | 0.5-30mm | 0.5-30mm |
Length | 2m--5.8m/6m/12m and RANDOM LENGTH or according to the customer's requirement | ||
Standard | ASTM A53,BS1387-85,GB/T3091-08,DIN2440,JIS-G3444,EN10255 | ||
Zinc Coating | Pre galvanized steel pipe: 60-150g/m2; Hot dipped galvanized steel pipe: 200-400g/m2 | ||
End Finish | Plain/ beveled ends or threaded with sockets/coupling and plastic caps. | ||
Usage | Scaffolding pipe, Structure pipe, Fence/Door pipe, Furniture, Low pressure fluid pipe for water oil or gas, Boiler pipe. | ||
Inspection | With hydraulic testing, eddy current and infrared test | ||
Packing | In bundles, packed in woven bag; in loose; and you can choose the PVC sheet covered. Or according to the customer's request. | ||
Delivery Time | 7--20days after receiving advanced payment or original L/C at sight and up to the quantity and mateiral. ASAP to save your time. | ||
Payment Terms | T/T or L/C | ||
Others | 1: Special design available according to requirement. 2: Pipe can be necked down, punching hole on pipe wall. 3: Pipe fittings, elbows are available. 4: All production process are under the ISO9001:2000 strictly. |