user login

CLOD DRAWN GALVANIZED SMLS STEEL PIPE FROM CHINA

600.0~1000.0 USD
Min. Order: 5 Ton
Trade Term: FOB
Payment Terms: L/C, D/A, T/T
Supply Ability: 4000TON/MONTH
Place of Origin: Hebei

Company Profile

Location: Cangzhou, Hebei, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: API 5L Cold Drawn Seamless Steel Tube, Hot Galvanized Seamless Steel Pipe, Seamless Steel Pipe, ASTM A53/A106 Black Sch40-Sch160 Seamless Steel Tube, Astm A106 Seamless Tube

Product Detail

Model No.: 21.3~508MM
Means of Transport: Ocean
WT: 1.5~16MM
Production Capacity: 4000TON/MONTH
Packing: 1.Small OD: Packed by steel strips 2,According to customers' requirement
Delivery Date: 15~20days
Show

Product Description

CLOD DRAWN GALVANIZED SMLS STEEL PIPE FROM CHINA
CLOD DRAWN GALVANIZED SMLS STEEL PIPE FROM CHINA
ASTM A53/ASTM A106
BS1387/BS1139/EN39/EN10219/EN10217/EN10297/EN10296/EN10025
Q195/215/235/345
O.D
O.D tolerance
W.T
Thickness Tolerance
20-508 mm
±0.5mm
1.5-16 MM
±8%
Length
1-12M , according to customers' requirements
Certificate
ISO9001-2008,EN10210,API,Raw material cert,Mill cert,Reap on site inspection report,SGS,BV
Standard
JIS G3444
ASTM A53/ASTM A36
BS1387/BS1139/EN39/EN10219/EN10217/EN10297/EN10296/EN10025
DIN EN10216,DIN EN10208,DIN EN10217, DIN28180,DIN17175, DIN EN10305, DINEN 10025
Material
Q195/215/235/345,
SS330/400/500,
S235JR/S235JQ/S235J2,
STK290,STK400,STK490,STK500,STK540
Inspection
With Hydraulic Testing, Eddy Current , Infrared Test
Technique:
Welded:Cold drawn,Hot rolled,heat extrusion
Packing
In bundles or according to customers' requirements
Usage
For construction, Pluid and Greenhouse
Main market:
Middle east,North and South America, East and West Europe, South and southeast Asia,Australia,Africa,
Place of Origin
China
HS code:
73063090
Productivity
10000Ton/Month
Processing
galvanzied,inner and outer stab clean,bevelled
threading,with coupling and plastic caps protected
packing in plastic cloths,3PE,FBE,corrosion resistant coating
Remarks
1)Payment term : T/T, L/C,
2)Trade Terms : FOB / CFR / CIF
3)Minimum quantity of order:15 MT
4)Delivery period :15 to 30 Days
Post Buying Request