Min. Order: | 10 Metric Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 1000 ton per month |
Place of Origin: | Hebei |
Location: | Cangzhou, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | API 5L Cold Drawn Seamless Steel Tube, Hot Galvanized Seamless Steel Pipe, Seamless Steel Pipe, ASTM A53/A106 Black Sch40-Sch160 Seamless Steel Tube, Astm A106 Seamless Tube |
Model No.: | 1/2"-14" |
---|---|
Means of Transport: | Ocean |
Technique: | Seamless |
Brand Name: | ZEWO |
Specification: | 13.7 - 508 mm |
Grade: | carbon steel |
Outer Diameter: | 13.7 - 140 mm |
Thickness: | 2 - 30 mm |
Length: | 6m |
Usage: | fluid pipe |
color: | Galvanized |
Production Capacity: | 1000 ton per month |
Packing: | Export standard package |
Delivery Date: | within 30 days |
Hot dipped galvanized Steel pipes ASTM A53/ASTM A36 BS1387/BS1139/EN39/EN10219/EN10217/EN10297/EN10296/EN10025 Q195/215/235/345 | |||
O.D | O.D tolerance | W.T | ThicknessTolerance |
20-508 mm | ±0.5mm | 1.5-16 MM | ±8% |
Length | 1-12M , according to customers'requirements | ||
Certificate | ISO9001-2008,EN10210,API,Raw material cert,Mill cert,Reap on site inspection report,SGS,BV | ||
Standard | JIS G3444 ASTM A53/ASTM A36 BS1387/BS1139/EN39/EN10219/EN10217/EN10297/EN10296/EN10025 DIN EN10216,DIN EN10208,DIN EN10217,DIN28180,DIN17175, DIN EN10305, DINEN 10025 | ||
Material | Q195/215/235/345, SS330/400/500, S235JR/S235JQ/S235J2, STK290,STK400,STK490,STK500,STK540 | ||
Inspection | With Hydraulic Testing, Eddy Current , InfraredTest | ||
Technique: | Welded:Cold drawn,Hot rolled,heat extrusion | ||
Packing | In bundles or according to customers'requirements | ||
Usage | For construction, Pluid andGreenhouse | ||
Main market: | Middle east,North and South America, East andWest Europe, South and southeast Asia,Australia,Africa, | ||
Place ofOrigin | China | ||
HS code: | 73063090 | ||
Productivity | 20000Ton/Month | ||
Processing | galvanzied,inner and outer stabclean,bevelled threading,with coupling and plastic capsprotected packing in plastic cloths,3PE,FBE,corrosionresistant coating | ||
Remarks | 1)Payment term : T/T, L/C, D/P 2)Trade Terms : FOB / CFR /CIF 3)Minimum quantity of order:15MT 4)Delivery period :15 to 30Days . |