user login

Emergency Bridge / Light Mountain Bridge / Mechanized Bridge For Plateau Vehicles

Place of Origin: Zhejiang

Company Profile

Location: Wuhan, Hubei, China (Mainland)
Business Type: Manufacturer
Main Products: Steel Truss Bridge

Product Description


Emergency Bridge / Light Mountain Bridge / Mechanized Bridge For Plateau Vehicles


Light Mountain Bridge is mainly used to erect an emergency bridge for all sorts of artilleries and vehicles to get across streams, trenches, ditches, craters or other obstacles not wider than 20.5m.
 

It can be used in plateau (with boost engine and oil adapted), mountain area, plain and paddy field area.

 

Specification for Light Mountain Bridge

 

Folded outline dimension (L*W*H)

10960*3200*3640mm

Gross weight

21.8t

Tracked load / Axle load

22t / 10t

Bridge weight

6.5t

Bridge length

22.5m

Negotiating width (on hard banks)

20.5m

Section length

7.5m

Roadway width

3.2m

Track girder width

1.16m

Erection / Retrieval time 

10/10 mim

Max. twist in erection

±5%

Allowable bank height difference

2.0m

Operator

3 operators

 

Post Buying Request