user login

Flexibility 51m Large - Span Mechanized / Emergency Bridges / Single Suspension Bridge

Place of Origin: Zhejiang

Company Profile

Location: Wuhan, Hubei, China (Mainland)
Business Type: Manufacturer
Main Products: Steel Truss Bridge

Product Description


Flexibility 51m Large - Span Mechanized / Emergency Bridges / Single Suspension Bridge
 

Description:
 

51m Large-Span Mechanized Bridge is a set of mechanized bridge with large single span carried by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge quickly to ensure all sorts of vehicles to go across rapidly.
 

51m Large-Span Mechanized Bridge possesses the feature of good flexibility, big single span, simple structure, speedy erection, high mechanization and less manpower. Besides, it has the advantages of convenient transportation and favorable adaptability of bank.

 

Specification

Curb weight of erection vehicle (including 3 men)                                      32.5t

Curb weight of transport vehicle                                                     20.8t

Bridge bay weight:                                                                  9.2t

Design load: tracked load                                                          LD-60

             Wheeled (load on axle)                                               LT-20

Erection length                                            17m, 25.5m, 34 m, 42.5 m, 51 m

Erection width                                                                      4m

Erection time (complete bridge)                                                    75min                                            

Retrieval time (complete bridge)                                                   75min

Operator                                6~7 men (not including drivers of transport vehicles)

 

Post Buying Request