Min. Order: | 1 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T, WU |
Supply Ability: | 2Piece/Pieces Per Month |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Distributor/Wholesaler |
Model No.: | COLO-L |
---|---|
Means of Transport: | Ocean |
Brand Name: | colo |
line: | Electrostatic Spraying |
Services: | Design, Manufacture, Installation |
production: | Automatic |
Certification: | CE |
Material / Metal: | Control Cabinet |
after-sale service: | worldwide |
output: | according clients request |
line speed: | adjusted |
how to order: | sent email to us please |
Specification: | Customized |
Production Capacity: | 2Piece/Pieces Per Month |
Packing: | wood box or carton box |
Delivery Date: | 15 -30days |
1.0 Design Explanation
1. Design Principles:
1. Powder Coating Object:
a) Items: galvanized steel, MAX SIZE: L 2000*W 1400*H 800(MM), 120 kgs/piece,
2. Powder Coating Method: Automatic Powder Coating + Manual;
3. Curing Oven: LPG Type Heating,
4. Workshop Area: L30×W15×H10(M)
2. Production Procedure:
Work Piece Loading→Automatic + Manual Powder Coating → Powder Curing (25minutes, 180~200℃) → Unloading
3. Powder Coating Conveyor Speed:
1. Conveyer Type: Suspension Conveyer Chain System
2. Production Line Working Speed: 2.5m/min (adjustable 0.5-4m/min),
(conveyor speed adjustable by inverter 1m/min);
3. Coating Curing Time: 25minutes, Curing Tunnel total length 22 meters.
(Including 3.6meter entry and exit)
4. Powder Coating Plant Components
Powder Coating Curing Tunnel 1 Set
No. | name | data |
1 | External size of drying tunnel: | 22000mm×2000mm×5300mm (refer to the layout) |
2 | Internal size of drying tunnel section: | (W)700mm×(H)3050mm(refer to the layout) |
3 | The model of drying tunnel: | straight-through |
4 | Thickness of the insulated board: | Side board:100mm, roof/bottom board:100mm |
5 | Inner and outer plate of insulation layer: | Internal board:δ1.0 galvanized board, outer board:δ0.6 color coated board |
6 | Sending wind tube: | δ 1.0mm galvanized board |
7 | Natural exhaust device: | 2 pieces |
8 | Pedestal height: | 430mm |
9 | Sending wind method: | side to send side up to back |
10 | Effective drying length: | About 18m( except to the length of air curtain section) |
11 | Baking time: | About 16min-20min |
12 | Heating time (empty furnace): | About 40min |
13 | Heating temperature: | Normal temperature~200℃ adjustable |
14 | Cycle times: | About 4 pieces/min |
15 | 400000 kcal stainless steel heat exchanger | 1set |
16 | 400000 kcl heat exchange box: | 1 set(outer plate:δ1.o mm cold plate, inner plate:δ1.o mm galvanized board) |
17 | Thermal induced draft fan: | 1set(4.0KW)with 6#impeller air volume about:10000m3/h |
18 | combustion gas engine: | 1 set FS40 (400000 kcal) |
19 | Air curtain machine: | 2sets |
2. Curing Tunnel Burner (GAS) and Heat Circulation System 1 Sets
3. Spraying Booth 1 Set
No. | name | data |
1 | Outer size of powder room: | 6000mm×1400mm×2500mm(refer to layout)(1set) |
2 | Material of powder room: | side\top\bottom board: δ1.2mm galvanized board (surface spraying) |
3 | Inverter lift | 2sets |
4 | Closed-circuit system | 1set |
5 | Automatic electrostatic sprayer: | 4sets |
6 | Manual sprayer | 3sets |
7 | 12 cores recycling of the upper and lower device | 1(hot plate and cold plate to make) the height of filter:660mm |
8 | Recover fan | 1sets(15Kw)air volume:20000m3/set
|
9 | Explosion-proof fluorescent lamp; | Each 1 piece of unilateral |
5. Reciprocator-COLO-2000D 2Set
6. Automatic powder spray gun system 1Set
7. CL-151S Manual Electrostatic Powder Coating Guns with Control 3Sets
8. Suspension Type Conveyor Line with Drive 1 Set
9. Electronic Control System 1 Set