Min. Order: | 1 Piece/Pieces |
---|---|
Payment Terms: | T/T |
Supply Ability: | 200Piece/Pieces Per Month |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Distributor/Wholesaler |
Model No.: | COLO-O |
---|---|
Means of Transport: | Ocean |
Brand Name: | colo |
type: | Curing oven |
weight: | 600kgs |
kind: | Oil fired oven |
Dimension(L*W*H): | L3.1*W2.0*H1.9(m) |
Material / Metal: | Steel,all metallic surface |
Voltage: | 415V/380V/220v/110v |
Power(W): | 5.5KW |
Certification: | CE/ISO |
After-sales Service Provided: | Overseas service center available |
Warranty: | 1 YEAR |
Production Capacity: | 200Piece/Pieces Per Month |
Packing: | Negotiation |
Delivery Date: | 15 days |
Automatic conveyor powder coating equipment with powder coating oven is designed and manufactured by professional color powder coating!
the "automatic conveyor powder coating equipment" is a traditional tunnel powder coating equipment, need little bigger available space.
The traditional automatic powder coating line is made with a normal single conveyor and tunnel oven.
Theprofile moves along with conveyor always, even turn the corner. Theoutput capacity is bigger if the conveyor speed is faster, but the ovenlength will be longer accordingly.
COLO-provide professional service of designing, manufacturing, assembling,commissioning and training in the coating industry. We have built uphundreds of turn-key projects in China and abroad. It is forelectrostatic powder coating equipment and powder coating oven.
Technicalinnovation never ends.COLO has developed the energy-saving heatingsystem, multi-track one oven curing system, high-efficiency powder recycle system,
simple and practical pretreatment system, compact powder coating equipment, power
and free conveyor system...which makes COLO to the advanced position of coating
industry.
Bridgecuring oven, batch operation, or automatic conveyorized operation,every powder coating system is customized designed to meet specificquality, performance, part size and production
requirements. With over twenty years of experience, COLO is able to "Right-sizing"
your powder coating equipment.
Details:
1) Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment
2) Conveying system: closed-circuit conveyor, power and free conveyor, multi-track
conveyor, and so on
3) Oven: batch oven, combination oven, bridge curing oven, tunnel oven
4) Powder coating booth: stainless steel booth or coated steel booth
5) Powder recycling facility: cyclone system or cartridge filter system
6) Control system: PLC control, with or without touch screen
7) Spray gun and reciprocator: COLO brand, or other brand like ITWgema...
Delivery
Lead time of manufacturing: 30-60 DAYS
FOB Ningbo/Shanghai Port
Installation and training
The seller's engineers will be sent for the installation and training. The expense of air tickets, room and board for our engineers has to be takenby the buyer.
Installation duration: around two weeks
Guarantee and after-sale service
The guarantee period of machinery is 12 months after shipping.
Withinthe guarantee time, the seller should be responsible for qualityproblem of the equipment except for man-made damage or problem caused by wrong operation.
After guarantee period, the seller will provide necessary support on thecustomer's demand and charge reasonably based on material cost