Min. Order: | 1 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T, WU |
Supply Ability: | 2Piece/Pieces Per Month |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Distributor/Wholesaler |
Model No.: | COLO-L |
---|---|
Means of Transport: | Ocean |
Brand Name: | colo |
line: | Electrostatic Spraying |
Services: | Design, Manufacture, Installation |
production: | Automatic |
Certification: | CE |
Material / Metal: | Aluminum Sheets |
after-sale service: | worldwide |
output: | according clients request |
line speed: | adjusted |
how to order: | sent email to us please |
Specification: | Customized |
Production Capacity: | 2Piece/Pieces Per Month |
Packing: | wood box or carton box |
Delivery Date: | 15 -30days |
aluminum profile automatic powder coating equipment is the most advanced auto- powder coating line, need small available space, but for very high capacity
profile powder coated production line introduction
Design the line according to your area and your request.Configuration characteristic of equipment Automatic Powder coating linefor aluminum profile: powder coating line is comprised with crane systemfor the pretreatment, drying oven, electrostatic spray and recyclespowder system, auto spray guns, curing oven, conveyor (track and chain)and the control panel.
Aluminum powder coated production line main composition
Pretreatment, water drying oven, powder curing oven, gas directheat exchange, suspension conveyor machine, electric control system,powder room, powder spraying equipment and so on made up of the wholeproduction line.
design principle
Our requirement of coating product quality is: strict compliantwith ISO9000 quality management system, quality first, credit first .wehave many years practice experience of turn-key coating field ,whichfrom designing ,processing, auxiliary equipment ,installing,commissioning ,and have finished more than hundreds of project. So manyyears effort made us won customers trust and support, and meanwhile weboast a lot of excellent experienced personnel of design, manufacturing,installation.
main techniques parameter of equipment is proposed by our company,and then confirmed by the buyer, Installation and commissioning are thekey to the whole coating line, we have a lot of experienced fieldinstallation personnel, taking tight control of every tiny step rangingfrom conveyor chain, pretreatment, spraying room, to curing equipment,it assure our equipment meet the design requirement.
technical parameter and data
1. Maximum combination work piece size:(L)6000×(W)500×(H)1500mm
2. Material of work piece: aluminum profiles
3. Conveyor speed: 1.5m/min (adjustable as per the thickness and material)
4. Heating medium: home gas (LPG)
5.Chain: single point100kg
6. Maximum temperature in the curing oven
7.Workshop: as layout 60m*20m*5m
8. Conveyor: single point loading capacity ≤100Kg
9. The output: 8000kg/8hours.
10. Operation condition:
1) Electric: Power:AC 380V 50Hz 3Φ
2) Calorific value of LPG : automatic spray 1.drying oven curing tunnel: (L)36000mm×(W)1200mm×(H)3200mm .
electrostatic spray and recycle powder system with the powder recovery system)auto spray gun:6 sets
(4)Manual spray gun: 2 sets
(5)closed-cycle system (vibrating unit) 1 set (6) reciprocator: 2 sets