Min. Order: | 1 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T, paypal, WU |
Supply Ability: | 500pieces per year |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Distributor/Wholesaler |
Model No.: | powder curing oven |
---|---|
Means of Transport: | Ocean, Air |
Condition: | new |
type: | powder curing oven |
Substrate: | iron |
coating: | powder coating |
powder coating equipment: | powder curing oven |
Production Capacity: | 500pieces per year |
Packing: | wood case |
Delivery Date: | 5-15days |
1,This Powder coating oven used for curing the workpiece which has been spraying during the powder coating
2, Electric heating
Powder Coating Industrial Cure Ovens
This Powder coating oven used for curing the workpiece which has been spraying during the powder coating. When a thermoset powder is exposed to elevated temperature, it begins to melt, flows out, and then chemically reacts to form a higher molecular weight polymer in a network-like structure.
Powder coating oven have a galvanized steel sheet on outside and steel sheet on the inside.
Structure:consist of Body,insulation, cover, heater(stainless steel heater withHeat Sink).use electricity to create the energy ,through the circulating fan ,make the temperature in the oven to rise uniformly. Then make the temperature of workpiece to rise.
along with a built-in track to roll your powder coating racks into the ovens.
Installation and operation
A, make sure the ground is level.
B, clean the inner of the oven, close the door.
C,make the workpieces which will to be cure ready. About half an hour.
D, Set the temperature as you required, normally for 180°C-200°C. set the time you need to cure, such as 25 minutes (this will according to thickness of your workpiece, if for thin,then 20mins,for thickness about 25mins).open the door, push the workpieces into the oven,close the door.
E, turn on the power switch,and then press the bottom of turn on
F, After the temperature reach to the value we setted, the time will begin to change.(you don't need to operate, it is automatic change )
G, When hear the bell ring, press the bottom of turn off ,push out the workpiece which has been cured. Push into the next batch.
H, please lift down the the workpiece which from the oven after cured ,after it will be cooled.
We provide stock or custom-built powder coating ovens.
All oven dimensions are interior
There is a one-year warranty on all electrical componets
Please allow us 2-3 weeks to build after you placing order.
Except the powder coating oven, we also manufacture the spray booth, powder coating gun, reciprocator, powder hopper and the related spare part.