user login

Industrial 5HP chiller machine

Min. Order: 5 Set/Sets
Payment Terms: T/T
Supply Ability: 20sets/month
Place of Origin: Shandong

Company Profile

Location: Qingdao, Shandong, China (Mainland)
Business Type: Manufacturer, Distributor/Wholesaler
Main Products: Door Seal Production Line

Product Detail

Model No.: 5HP
Means of Transport: Ocean
Brand Name: JG
Type: Water cooling machine
Compressor volume ratio: VI = 2.2/2.6/3.0/3.5
Production Capacity: 20sets/month
Packing: Buyers investment
Delivery Date: 1 month
Show

Product Description

Industrial 5HP chiller machine

Product introduction:

Air-cooled, self-made choice. (Domestic brand, imported compressor)
5HP Chiller Machine optimization appearance, than the similar product volume smaller, function more complete, control panel use more convenient. 5 HP cold water machine adopt international famous brand compressor, reliable quality, high efficiency and energy saving supporting high quality copper can make condenser, evaporator and the world famous brand control element, make 5 HP water chiller unit has small volume, low noise, energy, long service life, easy operation etc.
5 HP cold water machine features:
1, Adopts special refrigerant control loop, high precision temperature control and display temperature, automatic operation, high efficiency and low noise;
2, Adopts imported vortex compressor, refrigeration stable performance;
3,Outside rotor big air axial flow fan, metal blade is solid and reliable, the deformation and aging, more adapt to industry of high load applications.
4, Imports choose brand contactor, relay, etc electrical components; Equipped with perfect lamp, switch, operation be clear at a glance.
5, Built-in electronic level indication and alarm device, the operator through the control panel can be frozen water tank water level, timely water, low water level automatic alarm;
6, 5 HP cold water machine a full range of compressor volume ratio (VI = 2.2/2.6/3.0/3.5) for choice. Can effectively avoid with compression or compression shortage caused by the extra energy consumption.
7, Without long-term connection filling water pipe, use more convenient, and cut bottom solve floating ball valve filling water system the water leakage, water difficult to master, often maintenance problems.


Industrial 5HP chiller machine

Post Buying Request