Metal building workshop covers an area of 16000 M2 with single span of 48m and extra spans, eave height of 12m and 10 sets of 5 T cranes.
All the metal building workshop took totally 55 days from metal building designing, manufacturing to installation.
1. Main steel structure of metal building workshop: welded H steel;
2. Purlin:cold-rolled C section steel;
3. Roof panel: color steel sheet with foil insulation;
4. Tie bar: round tube;
5. Brace: round steel;
6. Lateral and column bracing: round steel;
7. Knee brace: hot- rolled angle steel;
8. Trims,flashing: color steel sheet;
9 Gutter:color steel sheet;
10. Downpipe: PVC;
11. Door: sandwich panel door;
12. Window: PVC window (single glass)
Metal building workshop featureas:
1. Metal workshop is light weight, high strength, large span;
2. Quality certification ISO:9001:2008
3. Metal workshop is short construction period, lower cost;
4. Workshop building is easy to move, recycle, environmentally;
5. Metal buildings are used widely, used as factory, workshop, warehouse, industry building, aircraft hangar etc;
6. Metal workshop building is structural durabilities, easy maintenance.