user login

Vibration Gravel Pile Driver

100000.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 50Units
Place of Origin: Jiangsu

Company Profile

Location: Xuzhou, Jiangsu, China (Mainland)
Business Type: Manufacturer
Main Products: Diesel Hammer Pile Driver, Multi-function Pile Driver, Gravel Pile Driver, Long Auger Drilling Rig, Truck Cranes

Product Detail

Model No.: DCB60-75S
Means of Transport: Ocean, Land
Brand Name: HAIGELISI
Max Vibratory Hammer Model: DD63/TD50/DZ75KS
Max. Piling Diameter (mm): 600
Max. Piling Depth (m): 15
Traveling Motion: Hydraulic Foot-Step
Rotation Angle: 360o
Production Capacity: 50Units
Packing: in bulk
Delivery Date: 15days
Show

Product Description

Vibratory pile driver, pile driver machine, Vibratory driver

Vibration Gravel Pile Driver

Vibration Gravel Pile Driver is the popular machine used for the foundation construction of high-rise building. The hydraulic rotation of this kind of vibration Pipe Gravel Pile is flexible and could rotate 360°. The machinery could be self-installed and self-discharging and it is easy to move because of the Hydraulic Foot-Step system. When transporting, the upper frame will be folded back and the rotary drive do not need to dismantle. With the characters of convenient maintaining and operating, stable and reliable performance, highly economical and efficient, it is the best investment to improve your business productivity.

Operation Process:

1, Move the pile machine and body frame, make the pile tip align with pile location.

2, Drive the Vibratory Hammer, drop the pile to the established depth.

3, Fill in the required volume gravel to the pile machine.

4, Pump the air into the pile machine by air compressor.

5, Lift the machine1—2m, the gravel will drop to the drilling hole by the air pressure and gravity.

6, Drop the pile machine to ensure the gravel compact.

7, Repeat above (4)\(5)\(6) process.

8, When the gravel in the pile machine to be used at the allowed volume, fill in the gravel again, then repeat above (4)\(5)\(6) process.

9, when the pile machine lifted to the designed height of the pile top, all the process complete.

By this means, the construction speed is 1.5-2.6 times than routine methods.

Post Buying Request