user login

FeCrAl (0Cr23Al5) Resistance Heating Wire

20.0~45.0 USD
Min. Order: 50 Kilogram
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 2 Tons per Month
Place of Origin: Beijing

Company Profile

Location: Beijing, China (Mainland)
Business Type: Manufacturer
Main Products: Resistance Wire, Resistance Furnace Wire, Nichrome Resistance Wire, Kanthal A Wire, Heat Resistance Wire

Product Detail

Means of Transport: Ocean, Air, Land
Resistance Heating Wire: Resistance Wire
Production Capacity: 2 Tons per Month
Packing: Standard Export Package
Delivery Date: 3-30days
Show

Product Description

FeCrAl (0Cr23Al5) Resistance Heating Wire
Heanjia Super-metals Co., Ltd. supplies FeCrAl (0Cr23Al5) Resistance Heating Wire. The FeCrAl (0Cr23Al5) Resistance Heating Wire is a ferritic iron-chromium-aluminium alloy (FeCrAl alloy) which is used at temperatures up to 1250°C. It is used in fast response elements for ceramic glass top hobs and quartz tube heaters. FeCrAl (0Cr23Al5) Resistance Heating Wire is widely used in household lectrical appliance, heating elements, mechanical manufacturing and other industrial fields.
Chemical Composition (%) and Properties
H23YU5 0Cr23Al5
Main Chemical Composition
Cr
20.5-23.5
Al
4.2-5.3
Fe
Rest
Mn
≤0.7
Max Continuous Service Temp.of Element °C
1250
Density g/cm³
7.25
Resistivity Ω m²/m
1.35±0.06
Temp.Coefficient of Resistance
14.5
Melting point
°C
1500
Tensile strength
Mpa
637-784
Elongation %
>12
Variation of area
%
65-75
Bending frequency
>5
Hardness
200-260
Micrographic Structure
F
Magnetic Property
Magnetic
Wire Specification
Wire
CNS 2962-1984
Diameter:0.05mm-10.0mm,
0.002 Inch to 0.3937 Inch
Manufacture Process
The manufacture started with producing ingot by advanced vacuum melting process. The wire production includes forging, rolling, annealing and drawing. From the ingot to the final thin wire, manufacture process is operated with high standard quality control system. There will be quality test for each batch of product, such as test to diameter tolerance, content, hardness, etc.
Packing Process & Transportation
Packaging: Seal up, with plastic inside and wooden case or carton outside; or according to the customer's requirements.
Transportation: By air or By sea
Other Terms
Minimum Order Quantity
Manufacture Period
Payment Terms
50 KG
10-15 Days (Small Quantity)
20-40 Days (Mass Quantity)
L/C, T/T, Western Union
Post Buying Request