user login

Plastic runway each square metre price

Place of Origin: Beijing

Company Profile

Location: Beijing, China (Mainland)
Business Type: Manufacturer

Product Description

Plastic runway each square metre price
Composite type plastic track features
( a ) construction method
1: according to the runway refurbishment of the ground with the standard construction, really flatten compaction, the dust cleared completely, and the ground bumps to be machine emery cloth or scraping leveling production.
2: the site stability maintenance period and dry before laying PU sports venues laying materials.
3 sunny days of ground moisture determination with transparent tape to tape tape around on the ground, to be 2-4 hours after the internal if condensation phenomenon is not construction, or take the newspaper spread on the ground after construction, with flat cover, the very next day the newspapers out the ignition if not ignite said ground water before construction can not be.
( two) the construction steps:
One, base oil coating: strengthen and ditch and curb the next day, in order to prevent the back of paint.
Two, permeable pavement: 1 to EPDM 1-4mm PU 1-8004 black particles and binder mixture ratio, 4:1. 2 with double spiral forced mixer, mixing at least five minutes, stirring in the radial direction, so the particles can form completely by PU bond 1-8004 wetting. 3 mixing the raw materials sent to the designated area, with automatic level pavement mechanical spreading to all flat, and the attention level automatic paving machine having a high temperature (80 ℃) and pressure smooth functions, and smoothness is required to achieve a 3M parallel ruler detection under low 4mm error. And to be breathable layer completely solidified at the next steps.
In three, filling layer processing: according to HUF-12/SL-480=2/1 ratio, accurate weighing the main agent and hardening agent into mixing barrel, adding tackifier after 1%, with electric mixer to filler mixing.
Four level: sealant coating, finishing after every 12-24 hours, material has hardened, shaped, and then sprinkling on the surface of test water, and marked hydrocephalus position then suck water net, then PU material filling a depression.
Five: runway, runway marking marking shall be the responsibility of the Division I, marking must comply with the architect or engineer 's instructions, line width and color must follow the international track and Field Association ( IAAF ) regulations and instructions marking engineer.
Mixed type plastic track
Insurance value period: 8 years.
Ventilating type plastic track features
Ventilating type plastic runway pavement technology is imported from abroad advanced technology, professional digestion, China has now become a large, in the primary school, the most popular track and field sports venues, according to incomplete statistics in the laying of plastic runway in ventilating type plastic track share has reached about 65%. And mixed type, composite type plastic stadium runway, breathable plastic stadium runway has the following main advantages: air, no bubble, the underlying material is single component polyurethane with elastic rubber combination, environmentally friendly products, with a ventilation function, under the high temperature, foundation to generate steam, will soon be sending out, unable to gather steam pressure, so that it does not produce bubble phenomenon.
Reminder: the beauty of Yi is a professional production of plastic runway material and artificial turf and is engaged in the sports venue construction company, has many years of experience in construction and professional construction team; the main items of indoor outside tennis court, basketball court, football field, badminton courts, silicon PU ground, artificial turf, plastic track, field facilities, and other sports equipment; welcome immediately consulting, advisory hot line: 010-56181008; welcome to the immediate understanding, we will provide you with considerate, fast construction scheme
Post Buying Request