Min. Order: | 30 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T, WU |
Supply Ability: | 10000 Piece/Pieces per Day |
Place of Origin: | Zhejiang |
Location: | Ningbo, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | OULU Plastic Inspection Well, PP Pipe Fittings, PPR Equal Tee, PPR Pipe Fitting, Butt Fusion Elbow |
Model No.: | DN90~DN400 |
---|---|
Means of Transport: | Ocean, Land |
Head Code: | Others |
Shape: | Others |
Technics: | Others |
Type: | Others |
Material: | Plastic |
Connection: | Others |
Brand Name: | OULU |
Material: | 100% new material PE100 |
Working Medium: | Water and Gas |
Working Pressure: | SDR11=PN16=1.6Mpa |
Working Tempreture: | -40℃~40℃ |
Specifications: | 90mm ~ 400mm |
Color: | Black, White |
Working Life: | More than 50 years |
Connection: | Electro Fusion Injection |
Packaging: | Plastic Bag, Cartons |
Certification: | ISO9001-2008 |
Production Capacity: | 10000 Piece/Pieces per Day |
Packing: | as per requirement or naked |
Delivery Date: | 25-30days |
HDPE Electro Fusion Repair Saddle Pipe Fittings
Item Code | Dn | L | H | PIN (Φ) |
GRR90 | 90 | 170 | 40 | 4.7 |
GRR110 | 110 | 180 | 50 | 4.7 |
GRR125 | 125 | 185 | 55 | 4.7 |
GRR160 | 160 | 230 | 75 | 4.7 |
GRR200 | 200 | 246 | 92 | 4.7 |
GRR250 | 250 | 320 | 100 | 4.7 |
GRR315 | 315 | 315 | 90 | 4.7 |
GRR400 | 400 | 315 | 85 | 4.7 |
>Material: 100% new materialPE100
>Working Medium: Water and Gas
>Working Pressure: 1.6Mpa
>Working Temperature: -40℃~40℃
>Specifications: Dn90 ~ Dn400
>New mould and scientific design
>Competitive price and accept OEM
>Recycled and Environment-friendly
>Color: black or other colors on request
>Guarantee period : more than 50 years under proper use