Min. Order: | 1 Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T |
Supply Ability: | 2500 tons/month |
Place of Origin: | Zhejiang |
Location: | Ningbo, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Agent, Distributor/Wholesaler |
Main Products: | 4140 Hollow Bar Hollow Section, ASTM A192, ASTM A179, EN10216-2 Boiler Steel Pipes, Drill Rod Mining Tubes |
Means of Transport: | Ocean |
---|---|
Technique: | Seamless |
Brand Name: | New Era |
Grade: | E155, E195, E235, E275, E355 |
Outer Diameter: | 6--88mm |
Thickness: | 1--20mm |
Length: | Max 12000mm |
Usage: | For Auto industry/for machinery use/oil cylinder tube/motorcycle shock absorber/auto shock absorber inner cylinder |
Certification: | ISO 9001-2008, TS16949 |
Delivery Time: | 40 days |
Payment Term: | TT |
Production Capacity: | 2500 tons/month |
Packing: | Standard Export Package |
Delivery Date: | 40 days |
Grade | Chemical Composition(%) | ||||||||||
Steel Name | Steel Number | C(Max) | Si(Max) | Mn(Max) | P(Max) | S(Max) | Cr | NI | Cu | Mo | V |
E155 | 1.0033 | 0.11 | 0.35 | 0.70 | 0.03 | 0.025 | - | - | - | - | - |
E195 | 1.0034 | 0.15 | 0.35 | 0.70 | 0.03 | 0.025 | - | - | - | - | - |
E235 | 1.0308 | 0.17 | 0.35 | 1.20 | 0.03 | 0.025 | |||||
E275 | 1.0225 | 0.21 | 0.35 | 1.40 | 0.03 | 0.025 | |||||
E355 | 1.0580 | 0.22 | 0.35 | 1.60 | 0.03 | 0.025 |
Steel Grade | Minimum values for thedelivery condition | ||||||||||||
Steel Name | Steel Number | (+C c ) | (+LC c ) | (+SR) | (+A d ) | (+N)NBK | |||||||
Rm Mpa | A% | Rm Mpa | A% | Rm Mpa | ReH Mpa | A% | Rm Mpa | A% | Rm Mpa | ReH e Mpa | A% | ||
E155 | 1.0033 | 400 | 6 | 350 | 10 | 350 | 245 | 18 | 260 | 28 | 28 | 270-410 | 155 |
E195 | 1.0034 | 420 | 6 | 370 | 10 | 370 | 260 | 18 | 290 | 28 | 28 | 300-440 | 195 |
E235 | 1.0308 | 490 | 6 | 440 | 10 | 440 | 325 | 14 | 315 | 25 | 25 | 340-480 | 235 |
E275 | 1.0225 | 560 | 5 | 510 | 8 | 510 | 375 | 12 | 390 | 21 | 21 | 410-550 | 275 |
E355 | 1.0580 | 640 | 4 | 590 | 6 | 590 | 435 | 10 | 450 | 22 | 22 | 490-630 | 355 |
ARm: tensilestrength; ReH: upper yield strength; A: elongation after fracture B1Mpa=1N/mm 2 CDepending on the degree of cold work in the finishingpass the yield strength may nearly be as high as the tensile strength. DFor calculation purposes the following relations are recommended: For delivery condition +C: ReH≥ 0.8Rm for delivery condition+LC: ReH≥ 0.7Rm EFor calculation purposes the following relation is recommended: ReH≥0.5Rm FFor tubes with outside diameter≤ 30mm and wall thickness≤ 3mm the ReH minimum values are 10Mpa lower than thevalues given in this table. |